Download presentation
Presentation is loading. Please wait.
Published byLawrence Parks Modified over 9 years ago
1
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011
2
Measure Summary Measure name: Fan Variable Frequency Drive Measure type; Standard Protocol Requesting Status: None at this time Change in measure status: n/a Change in measure savings: n/a Change in measure cost effectiveness: n/a Other or follow-on work for RTF: Integrate calculator into ProCost, complete measure Workbook. Approve Fan VFD Standard Protocol and calculator.
3
Measure History Previously approved: New Standard Protocol Measure developer(s): SBW, RTF What is the status of: – Protocol: Draft Subcommittee reviewed – Workbooks: To be completed – Summary sheet: To be completed – Protocol Documentation: Draft Subcommittee reviewed – Measure cost and life documentation: Draft – Data and evaluation sources: Draft Subcommittee reviewed
4
Subcommittee Summary Subcommittee meetings: 13 June 2011 Subcommittee members: Todd Amundsen, Mike Baker, Travis Reeder, Bill Koran, Andie Baker, Ben Lipscom, Ken Baker, Brad Aker, Jeff Romberger, Erin Hope Biases or disclosed conflicts of interest: SBW is currently contracted to develop Guidelines that included identifying needs for updating measures to new guidelines. PECI is developing Fan VFD measurement and verification practices for BPA.
5
Subcommittee Summary Recommendation(s), concerns: – Protocol needs three data points for reliability – static pressure, power and flow need to be collected for accuracy – Need to account for minimum static control conditions – NEFPA 70 practitioners qualifications “qualified electrical worker vs. electrician
6
Subcommittee Summary Recommendation(s), concerns: – LBL fan VFD work may provide data (Bill Wray), SnoPUD, PSE,EWEB – Need confidence in system operating point and curve fit – Calculator needed to test protocol against known data
7
Recommendations Subcommittee recommendations: Collect more field measurement data Develop calculator based on three data points Test calculator against field pre-post data Revise or refine via subcommittee feedback
8
RTF Proposed Motion: “I _________ move that the RTF Authorize staff to contract for $24,700 for development, completion and testing of a Fan VFD standard protocol compliant calculator with all the attendant documentation, input forms and data sources.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.