Presentation is loading. Please wait.

Presentation is loading. Please wait.

Construction Plant Maintenance Quality Network Event 23 rd August 2013 John McGrath External Verifier.

Similar presentations


Presentation on theme: "Construction Plant Maintenance Quality Network Event 23 rd August 2013 John McGrath External Verifier."— Presentation transcript:

1 Construction Plant Maintenance Quality Network Event 23 rd August 2013 John McGrath External Verifier

2 SQA Qualifications: Plant Maintenance Level 1 SVQ in Plant Maintenance: G7C9-21 Level 2 SVQ in Plant Maintenance: G7CA-22 Level 3 SVQ in Plant Maintenance: G7CC-23 The above qualifications have now lapsed as from 30 th June 2013 and have been replaced with a new qualification at Level 2 and Level 3 (Level 1 has been withdrawn). Any candidates currently registered will need to complete by June 2015 TT

3 Lapsed SVQ Qualifications SVQ Level 1 in Plant Maintenance MANDATORY UNITS PM 01 Contribute to a Safe Working Environment PM 02 Carry Out Basic Maintenance on Plant and Equipment PM 03 Carry Out Bench Fitting Activities PM 04 Operate Plant Machinery and Equipment (No Load Conditions)

4 Lapsed SVQ Qualifications SQA Level 2 in Plant Maintenance MANDATORY UNITS PM 05 Carry Out Servicing and Maintenance of Plant and Equipment PM 06 Remove and Replace Plant Equipment Components PM 07 Dismantle and Assemble Plant and Equipment Components PM 08 Maintain the Work Area PM 09 Inspect Plant and Equipment for Operational Serviceability PM 10 Diagnose Faults in Plant Equipment Systems and Components

5 Lapsed SVQ Qualifications PLUS OPTIONAL UNITS (3 units required from the following 7 units) PM 11 Repair Plant and Equipment by Soldering and Welding PM 12 Produce One-off Components to Assist Plant and Equipment Activities PM 13 Move Standard Loads PM 14 Install Plant and Equipment for Operational Activities PM 15 Carry Out Specific Tests on Plant Equipment PM 16 Configure Plant and Equipment for Operational Activities PM 23 Hand Over Plant and Equipment to the Control of Others

6 Lapsed SVQ Qualifications SQA Level 3 in Plant Maintenance MANDATORY UNITS PM 17 Service and Maintain the Condition of Plant and Equipment PM 18 Return Plant and Equipment to Service by Repair and Overhaul PM 19 Conduct Testing of Plant and Equipment Following Repair PM 20 Diagnose and Determine the Cause of Faults and Problems in Plant and Equipment PM 21 Control the Use of Allocated Resources for Plant Maintenance and Repair Activities

7 Lapsed SVQ Qualifications PLUS OPTIONAL UNITS (3 units required from the following 9 units) PM 11 Repair Plant and Equipment by Soldering and Welding PM 12 Produce One-off Components to Assist Plant and Equipment Activities PM 13 Move Standard Loads PM 14 Install Plant and Equipment for Operational Activities PM 16 Configure Plant and Equipment for Operational Activities PM 22 Inspect Plant and Equipment for Serviceability PM 23 Hand Over Plant and Equipment to the Control of Others PM 24 Provide Technical Information and Advice to Users of Plant and Equipment PM 25 Co-ordinate Plant Maintenance Work Activities

8 New Qualifications  Current from June 2013  New titles:  SVQ 2 in Construction Plant or Machinery Maintenance  SVQ 3 in Construction Plant or Machinery Maintenance  Level 2 and 3 only  No Level 1

9 New Qualifications SVQ 2 in Construction Plant or Machinery Maintenance Mandatory Units VR641 Conform to general workplace health, safety and welfare VR642 Conform to productive work practices VR643 Move, handle or store resources VR659 Operate plant or machinery for non-operational activities VR660 Service plant or machinery VR661 Remove and replace plant or machinery components to restore operational use VR662 Dismantle and assemble plant or machinery components to replace worn, damaged or faulty parts VR663 Inspect plant or machinery for operational serviceability VR664 Diagnose faults in plant or machinery systems or components

10 New Qualifications Plus Optional Units (two units from the following required) VR665 Install, repair or modify construction resources by heating, welding, brazing, soldering and thermal cutting VR666 Produce one-off components to restore or maintain the operational functions of plant or machinery VR667 Install plant or machinery for operational activities VR668 Carry out specific tests on plant or machinery to determine operational serviceability VR669 Configure plant or machinery for specific operational activities VR672 Hand over plant or machinery to the control of others Total of 11 units required

11 New Qualifications SVQ 3 in Construction Plant or Machinery Maintenance Mandatory Units VR209 Confirm work activities and resources for the work VR210 Develop and maintain good working relationships VR211 Confirm the occupational method of work VR659 Operate plant or machinery for non-operational activities VR664 Diagnose faults in plant or machinery systems or components VR670 Determine and complete service to maintain plant or machinery VR671 Determine and advise on the viability of repair or replacement for returning plant or machinery to service

12 New Qualifications Plus Optional Units (one unit from the following required) VR672 Hand over plant or machinery to the control of others VR673 Provide technical information, advice and guidance to users of plant or machinery Plus Optional Units (two units from the following required) VR665 Install repair or modify construction resources by heating, welding, brazing, soldering and thermal cutting VR666 Produce one-off components to restore or maintain the operational functions of plant or machinery VR667 Install plant or machinery for operational activities VR669 Configure plant or machinery for specific operational activities Total of 10 units required

13  Subject Specialist E.Vs.  No reportable External Verification issues found  Developmental and supportive approach to verification.  Identifying and sharing good practice.  Quality Networks.  Partnership “ Critical Friend” SQA Approach

14


Download ppt "Construction Plant Maintenance Quality Network Event 23 rd August 2013 John McGrath External Verifier."

Similar presentations


Ads by Google