Sheet/Plate/Structural Steel
4
Structural Steel Fabrication
5
Structural INEFFICIENCIES Lead Times & Delivery Date ?
6
BIM Modeling (Building Information Modeling)
7
BIM Modeling (Building Information Modeling)
8
CNC Plasma Cutting
9
Steel Casting
11
Survey Process 3 Months 40 Companies 75% Response Rate!
12
Survey Demographics… 75% MN ~ 25% WI 52% Manufac./Fabricators 19% Construction/Gen. Contractors 13% Foundries 10% Machinists 6% Other
13
Survey Demographics… >1,600 FTEs = 75FTEs Avg. >80% 40% expanding by 2017 Steady or Growing Buy Local Satisfy Clients Invest in Capital
14
Brass Tacks: Steel Sourcing (Conservative Sheet & Struct. #’s) ~17,000st/yr ~500mi 21Days Lead _______________ =$32,500,000/yr
15
Initial Conclusion Steel Supply: STOP! & Look both ways…
16
Brass Tacks: Structural Fab. (Conservative #’s) ~17,000st/yr ~600mi _______________ =$13,000,000/yr
17
Initial Conclusion Structural Fab: RUN! …don’t walk
18
CNC Structural Fabrication
19
Brass Tacks: Steel Casting Low Response Rate… …Too low
20
Initial Conclusion Steel Casting: Keep Digging.
21
Moving Forward