Download presentation
Presentation is loading. Please wait.
Published byCrystal Brooks Modified over 9 years ago
1
Business Template
2
We are T.E.A.M. Technology "Connections with cost efficiency in mind“ Cost efficient design for an expanding business. Made the most out of the new building layouts. Fine tuned the original design, made it more flexible.
3
Office Layout Priorities Flexibility Room for Expansion Professional Atmosphere Features 1 st Floor – up to 39 Workstations, 4 Offices and Conference Room. 2 nd Floor – up to 42 Workstations, 3 Offices 2 nd Building – 12 Workstations, 3 Offices, 4 additional jacks. 270+ Workstations, 30 Offices, 13,068 sqft Manufacturing Space Maximum Combined Capacity
4
96 ft 72 ft Equipment Closet Elevator BATHROOMS MAIN OFFICE Bldg 1 1 st Floor ## # ##### # ## #### ## # # # # ## # ### # # # # CONFERENCE ROOM ## Engineering OFFICE Storage OFFICEMail Room # Drop Plate 2x ### # # # # # # # # # Post # # # Administration Post Cat5ECat6 To 2 nd Floor Various To 2 nd Building (Fiber) ADMIN ENG Colorado Springs
5
96 ft 72 ft Equipment Closet Elevator BATHROOMS MAIN OFFICE Bldg 1 1 st Floor ## # ##### # ## #### ## # # # # ## # ### # # # # CONFERENCE ROOM ## OFFICE Storage OFFICE # Drop Plate 2x ### # # # # # # # # # Post # # Cat5ECat6 To 2 nd Floor Various To 2 nd Building (Fiber) Denver/Santa Fe
6
Equipment Closet Elevator Storage BATHROOMS OFFICE Bldg 1 2 nd Floor 96 ft 72 ft Post # $ # OFFICE # Cat5E To 1st Floor Cat6 Post OFFICE Post # # Drop Plate 2x ##### # # # ### # # # # # # # # # # Colorado Springs/Denver/Santa Fe
7
Equipment Closet Elevator Storage BATHROOMS Mega Office Bldg 1 2 nd Floor 96 ft 72 ft Post # $ # OFFICE # Cat5E To 1st Floor Cat6 Post OFFICE Post # # Drop Plate 2x ##### # # # ### # # # # # # # # # # Change Control #2 - Denver
8
Equipment Closet BATHROOMS OFFICE Bldg 2 Loading Dock 96 ft 72 ft $$ # # # Post Cat5E$ Drop Plate 1x To Main Building (Fiber) Various # # ## # # $ $ # Drop Plate 2x Colorado Springs/Denver/Santa Fe
9
Network Services Offices connected to each other using MPLS Bonded T1 through major provider for primary Internet connection at satellite offices, T3 at HQ Local cable provider 3MB data connection for backup at satellite offices, standby T3 at HQ using alternate provider Bldg 2 at each site connected via multi-mode fiber Each office supports VPN for remote connectivity
10
HQ in Denver T3 with T3 Failover COS Office Bonded T1s with Cable Failover Santa Fe Office Bonded T1s with Cable Failover Multiprotocol Label Switching (MPLS) WAN Diagram
11
Data Services Each of two trusted domains serviced by associated servers at each site. Domain Authentication File Sharing Printer Sharing MS Exchange Server will run on HQ Admin server
12
Data Services Cont. Data Backup server with tape library provides data backup and restoration services from HQ Each satellite office has application server HQ includes mirrored application server Each Office has fileserver dedicated to Test/Fab dept. HQ includes Storage Area Network
13
COS Network Diagram Internet Cisco 3005 VPN Concentrator 1 st floor 48 Port GB Switch Cable Provider Wireless Access Point Bonded T1 Connection Admin Domain File/Print Engineer Domain File/Print Application Admin Domain Users Engineer Domain Users 2 nd Floor 48 Port GB Port Switch Cat 6 Ethernet Cat 5E Ethernet Various 3MB Data Failover Test/Fab File Server Test/Fab Users MMO Fiber Cisco 2911 Router/Firewall Bldg 2 48 Port GB Switch
14
Santa Fe Network Diagram Internet Cisco 3005 VPN Concentrator 1 st floor 48 Port GB Switch Cable Provider Wireless Access Point Bonded T1 Connection Admin Domain File/Print Engineer Domain File/Print Application Admin Domain Users Engineer Domain Users 2 nd Floor 48 Port GB Port Switch Cat 6 Ethernet Cat 5E Ethernet Various 3MB Data Failover Test/Fab File Server Test/Fab Users MMO Fiber Cisco 2911 Router/Firewall Bldg 2 48 Port GB Switch
15
Denver Network Diagram Internet Cisco 3005 VPN Concentrator 1 st floor 48 Port GB Switch Wireless Access Point T3 Connection Admin Domain File/Print Engineer Domain File/Print Test/Fab File Server Application Admin Domain Users Engineer Domain Users 2 nd Floor 48 Port GB Port Switch Cat 6 Ethernet Cat 5E Ethernet Various T3 Data Failover Data Backup Test/Fab Users MMO Fiber Cisco 2911 Router/Firewall Bldg 2 48 Port GB Switch SAN TL2000 Tape Library Application Mirror
16
Network Equipment List QTYNomenclature Unit Price Extended Price 3 Cisco 2911 Security Bundle – router$2,379.99$7139.97 3 Cisco VPN Concentrator 3005$1,690$5,070 1Dell PowerVault TL2000 Tape library$5,899 12 NETGEAR GS748T 48-port Gigabit Smart Switch$529.99$6,359.88 3 Cisco WAP4410N Wireless-N Access Point - PoE/Advanced Security$179.99$539.97 3 Cat 5E Cabling Infrastructure$1,950$5,850 3 Cat 5E Install$1,800$5,400 33Drop Columns (Power and Data)$230.63$7610.79 195Wall Jacks (Double outlet)$13.99$2728.05 12Wall Jacks (Single Outlet)$9.99$119.88
17
Network Equipment List cont. 300 3' Blue Cat 5E Patch Cables (For Trusted Network Patching)$1.50$450 60 3' Red Cat 5E Patch Cables (For DMZ Network Patching)$1.50$90 300 7' Blue Cat 5E Cable for End User Trusted Network Connection$3.00$900 60 7' Red Cat 5E Cable for End User Guest Network Connection$3.00$180 30 7' Green Cat 6 Patch Cables$6.00$180 24 Dell Broadcom 5709 Dual Port 1GbE NIC$169.99$4,079.76 90 100 MB NIC: 317450-B21$28$2520 3 Management laptops: Dell Latitude E6510$1059$3177 15 HP LaserJet PRO P1606DN$280$4200 Total:$16235.57$62494.30 QTYNomenclature Unit Price Extended Price
18
Summary T.E.A.M. Technology proposal provides robust and efficient network services that exceed the current business requirements and allow for easy expansion at a very reasonable cost. We have proven this with the expansions we have made throughout this project.
19
Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.