Download presentation
Presentation is loading. Please wait.
Published byDorthy Watkins Modified over 9 years ago
1
Prevention of Central Line Associated Bloodstream Infections (CLABs) Quality and Patient Safety Effectiveness and Outcomes Beth Israel Medical Center Petrie and Kings Highway Divisions
2
CLABs Myths Our infection rates are below national benchmarks - which is good enough. CLABs are inevitable. It is the price we pay for sophisticated, complex care of severely ill patients. CLABs are benign and readily treated with antibiotics. CLABs are a common accompaniment of complex care and covered by outlier payments.
3
Lessons Learned We can come surprisingly close to eliminating hospital acquired infections with determination as opposed to resources Our data must not only be reportable but actionable Save lives Reduce costs Reduce error and waste
4
How We Did It Make data actionable Observe variations in work practices Real time problem solving of origins of CLABs Implement and test practice changes
5
Make Data Actionable Start small Use and monitoring of evidence based patient care practices or “bundles” with reporting back of data to end users Counter measures generated by the people who do the work Process that generates sustainable fixes Avoid “workarounds” that are constantly repeated Set a time to achieve goal Plan-Do-Study Act (PDSA) methodology
6
Beth Israel Medical Center Petrie Division Kings Highway Division 94 ICU beds 3,000 discharges 824 non-ICU beds 43,000 discharges 1,200 central lines placed annually 40% of patients in ICU with central line Average length of stay for patients with central line = 5 days Average length of stay for patients with CLAB = 10 days CLABs rate of 9 per 1,000 device days or 3.8% in 2004
7
Beth Israel Medical Center CLABs Prevention June 2005 ICU MICU, SICU August 2005 CCU and CSICU December 2005 Emergency Departments January 2006 General Medical Surgical Units April 2006 Operating Room August 2006 NICU and PICU
8
Multi-disciplinary CLABs Team Members Physicians Chief Medical Officer Associate Chairman, Department of Medicine Director ICU, MICU, SICU Emergency Room Medical and Emergency Department Residency Programs Intensivist Critical Care Fellow Infection Control Hospital Epidemiologist Manager Practitioner Patient Care Services Vice President Director Nurse Manager ICU, MICU, SICU Emergency Room Nurse Education Manager Other Director Materials Management Housekeeping Respiratory Therapy Quality Improvement Pharmacist Dietician
9
Multi-disciplinary CLABs Team Principles It is not good enough that our infection rates are below national benchmarks. CLABs are preventable, they are not an inevitable consequence of sophisticated, complex care that we provide to our severely ill patients.
10
Multi-disciplinary CLABs Team Principles CLABs can be eliminated by determination as opposed to additional resources. Strict adherence to evidence based patient care practices, called “bundles” that will improve patient safety and reduce adverse patient outcomes is required.
11
Multi-disciplinary CLABs Team Principles Patient hospital length of stay, morbidity and mortality can be reduced through prevention of CLABs. We can reduce the Medical Center’s costs incurred for the care of patients with CLABs.
12
CLABs Mortality = 18% ICU risk 8x >non-ICU Additional $40,000 to hospital costs Hospitals absorb the costs! BIMCUSA Patients in ICU with Central Line 40%48% CLABs Rate3.8%4% Increase LOS5 d14 d Nationally: 80,000 CLABs in ICUs per year 14,500 CLABs deaths
13
Used BI BSI information and discharge information from 2004 Costs Incurred For Care of Patients with CLABs Annual Incremental Costs Incremental Cost Per CLAB Patient CLAB Patients Discharges Per Year 94 ICU Beds $960,000$40,000 243,000 $1,510,000 Total Incremental CLAB Costs 824 Non-ICU Beds $550,000$25,000 2243,000
14
Multi-disciplinary CLABs Team Aims and Goals Process that generates sustainable fixes Avoid “workarounds” that are constantly repeated Collaborative process Knowledge gained from this process is shared with all Our data must not only be reportable but actionable
15
Beth Israel Medical Center CLABs Prevention Physician and Nurse reeducation and recertification on central line insertion technique and maintenance practices Standardization of practices to ensure Maximal barrier protection utilized Skin prep with chlorhexidine Preference for subclavian site unless medically contraindicated
16
Beth Israel Medical Center CLABs Prevention Nursing empowerment to monitor practices Nursing permitted to ask and stop other persons who do not follow appropriate practices Hand hygiene compliance
17
Beth Israel Medical Center CLABs Prevention Daily review of line necessity Root cause analysis performed in real time for every CLAB Development of a central line insertion kit Barrier precaution components Insertion components Maintenance components
18
Beth Israel Medical Center CLABs Prevention Education and Recertification Standardization of Practices and Documentation but also: Hospital Specific Department Specific Unit Specific
19
2005 Infection Control Policy for Prevention of Intravascular Infection
20
Beth Israel Medical Center CLABs Prevention Education and Recertification Indications Anatomy Procedure “Time Out” Universal Protocol Patient Position Skin Preparation Maximal Barrier Precautions Anesthesia Approach Dressing Additional Expectations Clean up Monitor for complications
21
Procedure Competency Form
22
Beth Israel Medical Center CLABs Prevention Education and Recertification
23
Beth Israel Medical Center CLABs Prevention Standardization of Practices Enforcement of Policy and Procedure Procedure Note Insertion Kit Nursing Empowerment
25
Central Line Insertion Kit
26
Compliance - Central Line Bundle
27
Results Data from PDSA Cycles Number of CLABS Costs of CLABS 200446$1,510,000 200518$705,000 20067$392,000 20072$112,000 Incremental cost per episode of CLAB ranges from $25,000 to $56,000 (CDC data: Burke 2003)
28
Results Data from PDSA Cycles Number of CLABS Attributable Morbidity and Mortality 2004469 2005184 200672 200720 Attributable morbidity and mortality: 12 – 25% (Wenzel 2001)
29
Results Data from PDSA Cycles Significant reduction in CLABs 95% reduction for institution Achievement of zero CLABs on a variety of units Reduction in morbidity and mortality Daily review of need for line necessity 20% decrease in central line days Reduction in costs incurred in caring for patients with CLABs $1,500,000 costs avoided 90% reduction in costs from 2004 Costs to implement Additional $15 per line inserted Total additional costs $30,000
30
Beth Israel Medical Center CLABs Prevention UnitLongest Duration of Days Without CLAB CCU644 ICU601 ED547 SICU483 PICU396 non-ICU345 MICU344 CSICU300
31
Beth Israel Medical Center CLABs Prevention ICUs
32
BETH ISRAEL MEDICAL CENTER CLABs Prevention CCU
33
Beth Israel Medical Center CLABs Prevention Root Cause Analyses Within 24 hours of a CLAB All involved patient care staff 4 – 12 persons ED, ICU, non-ICU 20 – 45 minutes Collaborative, non-punitive process
34
Beth Israel Medical Center CLABs Prevention Root Cause Analyses Process that generates sustainable fixes Avoid “workarounds” that are constantly repeated Knowledge gained from this process is shared with all
35
Beth Israel Medical Center CLABs Prevention Root Cause Analysis – August 2005 84 year old female with a history of hypertension, CHF, cardiac arrhythmia with pacer, insulin dependent diabetes Admitted to ICU with CHF exacerbation, pleural effusion Developed acute renal failure requiring dialysis Nephrologist places Shiley catheter Groin site chosen Difficult procedure requiring multiple attempts Maximal barrier precautions not fully utilized Nursing staff attempt to assist Call intensivist to place line Blood cultures positive for C. albicans 48 hours later
36
Beth Israel Medical Center CLABs Prevention Root Cause Analysis – August 2005 Nephrologist conducts RCA Credentialed Central line indicated Urgent not emergent Supplies available and easily obtainable but not fully utilized for maximal barrier precautions Need to ask for assistance sooner rather than later Corrective Actions Central line insertion kit Nursing staff empowered and more comfortable with role Reeducation and recertification of nephrologist
37
Beth Israel Medical Center CLABs Prevention Root Cause Analyses 2005 Central Line Care Dressings Access Insertion Practices Maximal barrier precautions Supplies never an issue Certification of physicians
38
Results - Data from PDSA Cycles ICU CLABs
39
Beth Israel Medical Center CLABs Prevention Root Cause Analyses 2006 Central Line Care Dressings Access Maintaining the momentum
40
Results - Data from PDSA Cycles ICU CLABs
41
Beth Israel Medical Center CLABs Prevention Use and monitoring of evidence based patient care practices or “bundles” with reporting back of data to end users resulted in the rapid and sustained elimination or decreased incidence of CLABs on many units Limited additional resources were necessary for the success of this initiative Efforts were effective for all areas of the hospital where central lines are inserted As compliance with insertion bundle improves, line maintenance has assumed a greater role in the prevention of CLABs Culture change regarding goal of zero CLABs infections is applicable for all hospital acquired infections and patient safety issues
42
GNYHA/UHF CLABs Collaborative Participating Hospitals Beth Israel Medical Center Bronx-Lebanon Hospital Center Brookdale Hospital Medical Center Cabrini Medical Center Good Samaritan Hospital Medical Center Interfaith Medical Center Kingsbrook Jewish Medical Center* Kingston Hospital* Lenox Hill Hospital Long Beach Medical Center Long Island College Hospital Lutheran Medical Center Montefiore Medical Center Mount Sinai Hospital Mount Sinai Hospital of Queens New York Downtown Hospital New York Hospital Queens* New York Methodist Hospital New York-Presbyterian Hospital New York University Medical Center North General Hospital Our Lady of Mercy Medical Center North Shore-Long Island Jewish Health System, including: –Forest Hills Hospital –Franklin Hospital –Glen Cove Hospital –Huntington Hospital –Long Island Jewish Medical Center –North Shore University Hospital –Plainview Hospital –Southside Hospital –Staten Island University Hospital –Syosset Hospital Peninsula Hospital Center Richmond University Medical Center* Sound Shore Medical Center of Westchester St. Catherine of Siena Medical St. Charles Hospital St. Joseph’s Medical Center, Yonkers* St. Luke’s - Roosevelt Hospital Center St. Luke's Cornwall Hospital St. Vincent’s Medical Center, Manhattan* Stamford Hospital The Parkway Hospital* Trinitas Hospital Winthrop University Hospital* Wyckoff Heights Medical Center *Hospitals that joined the CLABs Collaborative in the second round of participation (i.e., in August/September 2006).
43
GNYHA-UHF CLABs Collaborative Characteristics of Participating Hospitals 38 hospitals participating, 56 ICUs* At inception of Collaborative, hospital practice was widely variable across participants: GREAT OPPORTUNITIES FOR IMPROVEMENT ! Area of FocusConsistently UseInconsistently Use Do Not Use Daily Goals Sheet21726 Interdisciplinary Rounds4592 Central Line Bundle112717 Ventilator Bundle163010 Responses obtained from ICUs within participating hospitals. *Note that these were responses from the original group of 38 CLABs Collaborative participating hospitals.
44
GNYHA-UHF CLABs Collaborative Design Systematic model for change that would –Meet needs of hospitals within the region –Use existing staffing and financial resources
45
GNYHA/UHF CLABs Collaborative Design Hospital leadership involvement and commitment Interdisciplinary teams / Physician and Nurse champions Evidence-based interventions: Implemented “Central Line Bundle” 3 learning sessions: Reviewed key interventions for eliminating CLAB infections, guidelines for inserting central line, materials needed, maintaining central lines, hospital best practices, and approaches to sustaining improvements. Bi-weekly conference calls: Shared information / tools specific to reducing CLAB infections. Collaborative web site for information-sharing: http://jeny.ipro.org/clabshttp://jeny.ipro.org/clabs “Expert on Call” clinical consultant Reinforcement of “zero tolerance” for CLAB infections Standardized Materials: Teams developed and used standardized data collection and definitions Root Cause Analysis (RCA): Real time RCAs encouraged to identify reasons for CLABs and develop solutions for prevention Tracking Success: Aggregate and hospital-specific results reported monthly and site visits made by Collaborative sponsors to identify areas in need of support Central Line Bundle: Hospital teams identified the “central line bundle” as a strategy to prevent infection during central line insertion. Components include: hand hygiene, use of maximal barrier precautions, chlorhexidine skin use, site of line placement, and review of line necessity. All necessary supplies should be available at the patient’s bedside when needed (creation of central line insertion kit).
46
CLABs Collaborative Website: http://jeny.ipro.org/clabshttp://jeny.ipro.org/clabs
47
Examples of Findings from Root Cause Analyses Central Line– Associated Bloodstream Infection Lack of Education and Staffing Line Maintenance Technique not adequate Line not changed on timely basis Dressing not changed using aseptic techniques IV tubing not labeled properly to change Line not manipulated appropriately Line in for too long Not compliant with hand hygiene Line inserted w/o sterile technique Inadequate use of maximal barrier precautions Inadequate prep before insertion Femoral line chosen instead of subclavian Inexperienced residents and clinicians Clinicians not knowledgeable about Central Line Bundle Nurses do not properly know how to change dressings MD does not get someone to assist with line insertion Nurses too busy to check & change dressings
48
Barriers and Solutions BarrierSolution Development of central line insertion & maintenance kits Creation of monitoring tools to assure compliance with bundle components Empowerment of nursing staff to stop procedure when bundle not followed Development of Department/Hospital-wide educational programs re: insertion and maintenance Lack of Education & Staffing Daily rounds to assess line necessity and assure appropriate maintenance Lack of Compliance Maintenance Technique Reorganization of staffing to monitor and assure compliance Creation of protocols in which nursing signs off on dressing rounds Lack of Standardized Data Collection Adoption of CDC’s NHSN definitions Monthly data fed back (CLAB infection rates) to participating hospitals and staff
49
GNYHA-UHF Collaborative 15-Month Data Results* Bundle Implementation 1 : 88% reported full implementation; remaining 12% in process of fully implementing Mean pre-bundle implementation CLAB infection rate = 4.02 infections / 1,000 central line days Mean post-bundle implementation rate = 1.79 infections / 1,000 (p Value <0.0001) Overall Aggregate CLAB Infection Data: Mean baseline rate = 4.86 infections / 1,000 central line days Mean fifteen-month study period 2 infection rate = 2.38 infections / 1,000 51% overall decrease (p Value <0.0001) Comparison of CLAB Infection Data in 3-month Cohorts during 15- month Study Period 2 : Mean first three months (July through September 2005) = 3.10 infections / 1,000 central line days Mean last three months (July through September 2006) = 1.76 infections / 1,000 43% decrease during the course of the study period (p Value = 0.015) Maintaining Zero CLAB Infections during 15-month Study Period 2 : 29 hospitals (81%) maintained zero for at least 3 months 8 hospitals (22%) maintained zero during the last 6 months *Includes data from 36 of the 38 original participating hospitals Notes: 1 Bundle implementation, reported by 34 of the 38 original participating hospitals through an Interventions Survey developed by Collaborative sponsors, April 2006. 2 Study Period includes data collected by 36 of the 38 original participating hospitals from July 2005 through September 2006.
52
Decreasing Incidence of MDROs! BIMCPetrieKHD MRSA65%50% VRE15%25% MDR Klebsiella15%20% MDR Acinetobacter45%50% C. difficile10%35% Costs avoided: $1.5 million
53
Thank You
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.