Download presentation
Presentation is loading. Please wait.
Published byDwain Byrd Modified over 9 years ago
1
Critical Path Analysis By: Troy Gonsalves
2
Motivation The typical reason for failure is poor project-planning Poor planning can result in missed deadlines, inflated costs, and a slow, unreliable system Good management can not ensure project success but bad management usually results in project failure
3
Overview Task Definition Task Integration Matrix PERT chart Gantt chart
4
Task Definition ProjectPlanning.pdf pages 1-8
5
Task Integration Matrix Tutorial-Oct25.pdf Pages 4-5
6
PERT Program Evaluation and Review Technique To construct the PERT chart we must: Assign each task to a developer Specify the execution order of each developer’s tasks
7
PERT Syntax The typical graphical syntax for PERT charts results in confusing and often erroneous calculations Refer to Pert.xls for a better graphical syntax
8
Gantt Charts Refer to Gantt.xls
9
Links PERT tutorial: http://www.project-planning- tips.com/Project%20Planning%209.htm http://www.project-planning- tips.com/Project%20Planning%209.htm PERT and Gantt examples http://www.mckinnonsc.vic.edu.au/la/it/i pmnotes/ganttpert/ http://www.mckinnonsc.vic.edu.au/la/it/i pmnotes/ganttpert/
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.