Download presentation
Presentation is loading. Please wait.
Published byTyler Perkins Modified over 9 years ago
1
THE GRAMERCY RESIDENCES CONSTRUCTION UPDATES Century Properties May 2009
2
THE GRAMERCY RESIDENCES Century City, Makati THE GRAMERCY RESIDENCES Century City, Makati PROJECT TURNOVER DATE: Year 2012 Gramercy construction reaches ground floor Construction at the Gramercy site has commenced at the ground floor level. Following the completion of a 30-meter deep excavation, the 4-meter mat foundation and basements 6 to 4, rebar works, form works and concreting have moved on to Basements 3 up to the ground floor. As of May 29, 2009: ParticularsLEVEL Percentage of Accomplishment Sub-structureBSMT 5 BSMT 4 BSMT 3 BSMT 2 BSMT 1 GF 1. Rebars100% 90%65%40% 2. Forms100% 90%35% 3. Concreting100% 70%35% 30%
3
THE GRAMERCY RESIDENCES Century City, Makati Photo as of May 14, 2009
4
THE GRAMERCY RESIDENCES Century City, Makati Photo as of May 14, 2009
5
THE GRAMERCY RESIDENCES Century City, Makati Photo as of May 14, 2009
6
THE GRAMERCY RESIDENCES Century City, Makati Photo as of May 14, 2009
7
THE GRAMERCY RESIDENCES Century City, Makati Photo as of May 19, 2009
8
THE GRAMERCY RESIDENCES Century City, Makati Photo as of May 29, 2009
9
THE GRAMERCY RESIDENCES Century City, Makati Photo as of May 29, 2009
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.