CONSTRUCTION UPDATE The Knightsbridge Residences at Century City Century Properties - July 2009
2
Knightsbridge excavation reaches 21 percent in June Excavation works at the Knightsbridge site as of June has reached 21% or more than 16,000 cubic meters. The remaining volume of excavation is 67,833 cubic meters with a target depth of over 30 meters—as deep as the excavation completed for Knightsbridge’s neighboring residential tower at Century City, The Gramercy Residences.
3
THE KNIGHTSBRIDGE RESIDENCES Construction Site Kalayaan Ave., Makati Photos as of July 7, 2009