Download presentation
Presentation is loading. Please wait.
Published byJulia Brady Modified over 11 years ago
1
DIPARTIMENTO DELLA PROTEZIONE CIVILE SMIT SALVAGE BV
2
WORKING PONTOON AD-3
3
WORKING PONTOON AD-3: DECK PLAN
4
VLCC HAVEN WRECK LOCATION AND MOORING PLAN
5
OIL DISTRIBUTION : ENGINEROOM
6
OIL DISTRIBUTION : TYPICAL ACCOMMODATION DECK LAYOUT
7
SEQUENTIAL SCHEMATIC OF THE OIL REMOVAL
16
THE RECOVERED OIL WILL BE PUMPED TO THE AD-3 DIRECTLY TO THE SPECIALIST TANKTAINERS BEFORE TRANSFER TO THE DISPOSAL CONTRACTOR IN GENOVA. ON COMPLETION OF THE RECOVERY OPERATION THE SMIT TEAM AND ÄD-3 WILL DEMOBILISE FROM THE LOCATION
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.