Plan Review Required Materials [ARM 37.115.308(3)] – (a) a plan view and a sectional view of both the pool, spa, or other water feature or related facility,

Similar presentations


Presentation on theme: "Plan Review Required Materials [ARM 37.115.308(3)] – (a) a plan view and a sectional view of both the pool, spa, or other water feature or related facility,"— Presentation transcript:

1

2 Plan Review Required Materials [ARM 37.115.308(3)] – (a) a plan view and a sectional view of both the pool, spa, or other water feature or related facility, and surrounding area; – (b) one or more drawings showing cross-sections through the main drain; – (c) a drawing of the overall plan showing the pool, spa, or other water feature in relation to other facilities in the area, including any equipment room; – (d) a detailed view of the equipment layout in the equipment room; – (e) a piping schematic that shows the piping configuration, pipe size, valves, inlets, main drains, over flow outlets, skimmers, make-up water, backwash from the filter, and treatment facilities; – (f) scaled drawings of the pool bottom and sidewalls; – (g) cross section drawings with measurements of the step risers and treads and of any handrails; – (h) all manufacturer specifications for all required components of the pool, spa, or other water features including, but not limited to, treatment equipment, pumps, disinfectant feeders, chemical feeder filters, and strainers; – (i) specifications for the materials that will be used to construct the pool or spa and for the materials used as finishes on any of the walkways;

3 Plan Review Required Materials [ARM 37.115.308(3)] – (j) specifications for the slope and drainage of pool bottoms, decks, and other surface requiring drainage; – (k) plans and drawings related to all bathhouse or other sanitary facilities; – (l) an estimation of the anticipated bather load of the pool or spa; – (m) calculations of the surface area and volume of the pool, spa, or other water features, calculations of the turn-over rate, flow rate, water velocities, total dynamic head, and pump curve showing design flow for each swimming pool, spa, or other water feature; – (n) all specification sheet(s) pertaining to suction outlet cover/grates that will be used and documentation that they comply with ASME A112.19.8M-2007; – (o) the name and location of any water source that will or may supply water to the swimming pool, spa, or other water feature; – (p) details on the method that will be used to dispose of pool water and all other wastewater in compliance with applicable law; – (q) details on barrier construction; – (r) the plan review fee established in Table 1 of ARM 37.115.311; and – (s) any other information specifically requested by the department.

4 Plan Review

5

6 Final approved plans and specifications sent to county Verify that construction and equipment is consistent with approved plans Pre-Opening Inspection

7

8 Inspection

9 Pool Water Chemistry Is Easy! Don’t be afraid to do the test…. Follow instructions!

10 Supplies Test Kit* Thermometer* Towel Water Cup pH Meter