Presentation is loading. Please wait.

Presentation is loading. Please wait.

Company History  Prototype runs  Pre-production runs  Production runs  Quick Turnarounds ◦ 24 Hour turnarounds: ◦ 48 Hour turnarounds: ◦ 72 Hour.

Similar presentations


Presentation on theme: "Company History  Prototype runs  Pre-production runs  Production runs  Quick Turnarounds ◦ 24 Hour turnarounds: ◦ 48 Hour turnarounds: ◦ 72 Hour."— Presentation transcript:

1

2 Company History

3  Prototype runs  Pre-production runs  Production runs  Quick Turnarounds ◦ 24 Hour turnarounds: ◦ 48 Hour turnarounds: ◦ 72 Hour turnarounds:  Complete Turnkey or Consignment services  PCB layout and Design  Systems integration  ICT and Functional testing  Single & Double Sided Flying Probe Testing  Cable and Harnesses  Press Fit  Fulfillment and packaging services  Automatic Optical Inspection (AOI)  Ionic Cleaning System  Vapor Phase Reflow Soldering  Out of Box Audit / Source Inspection Services

4 We serve these industries using: ◦ Automated Surface Mount lines ◦ We offer variety of layout tools ◦ Flying Scorpion (double sided probe) ◦ Quick Turnaround ◦ Vapor Phase Reflow Soldering ◦ Free pick-up and delivery within the bay area Capabilities We serve various industries including: Medical Industrial Automation Automotive Memory related products Military Communications Unconventional products

5 Process Controls  Continuous Process Improvement  ISO-9001:2008 & 13485 Registered  CAPA based process control system  SPI and 5DX implemented for detection  Personnel Proficiency / Operator Certification  Statistical Process Control - CPK Tracking  Internal Audits and Quality Improvement Feedback  MRP and ERP systems in place  FMEA (Failure Mode & Effects Analysis)  ESD Prevention Practices & Monitoring  Calibration System traceable to NIST

6 Differentiatiors  Utilizing vapor phase reflow soldering  Double sided flying probe  Engineers on site (design/layout)  Testing/Xray in house  Quickturn capabilities  Programming and Final Assembly

7 Certificates / Standards  Quality System: ISO-13485 and ISO- 9001:2008 Quality System Standard  Workmanship Standard: IPC-A-610 class 1,2,3  Soldering Standard: J-STD-001 class 1,2,3  ANSI/ESD S20.20 Standard


Download ppt "Company History  Prototype runs  Pre-production runs  Production runs  Quick Turnarounds ◦ 24 Hour turnarounds: ◦ 48 Hour turnarounds: ◦ 72 Hour."

Similar presentations


Ads by Google