New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.

Similar presentations


Presentation on theme: "New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and."— Presentation transcript:

1 New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and Jamie Stewart, AIM ISD Support 23-25 Aug 11

2 Overview Summary of AIM I and AIM II 5.0 Functionality ‒ Demo of selected Functionality Summary of CPM 5.0 ‒ Demo of selected Functionality Summary of LO Module 5.0 Functionality ‒ Demo of selected Functionality Summary of in-process software capabilities ‒ CPM ‒ LO Module ‒ AIM I ‒ AIM II Discussion of potential future capabilities

3 Summary of AIM I/II in Rel 5.0 FRB Prioritized ACRs ‒Supporting AIM I and AIM II Include: ‒AIM II Content Comparison Report/Chg PkgAIM II Content Comparison Report/Chg Pkg ‒AIM I Exercise Controller Guide support ‒AIM II Associated Curriculum DocumentsAIM II Associated Curriculum Documents Numerous Smaller Items: ‒Ease of Use NETC specific items (mostly related to TPP) Note: Details of functionality in backup slides (time permitting).

4 Summary of AIM I/II in Rel 5.0 (contd) Some other items include: ‒Standardized Introduction DP’s (Establish contact, etc.) ‒Enhanced COI Split/Join Unit Topic functionality Select EO, click “Join EO”, select another EO (even from another TO) ‒Spell check – Course, Module, Lesson, Section Note: Details of functionality in backup slides (time permitting).

5 Summary of CPM Rel 5.0 NLOS search capability More ISD Considerations items support IMDP report TPP Modification/Cancelation Warn to Save before Exit Select All for checkbox functionality JDTA Enhancements ‒Copy and link/paste (in Project tab, too) ‒Search – Condition, Standard, Source Note: Details of functionality in backup slides (time permitting).

6 OCCSTDS Support in CPM How did we get here?: –Started with NETC N74/NAVMAC discussions –AIM Team Provided a CPM “sandbox” for NAVMAC familiarization –NAVMAC developed an OCCSTDS Storybook PPT to describe high-level functionality –Initial OCCSTDS tab implementation in Rel 5.0 for creation/management of OCCSTDS data by NAVMAC – crawl functionality Working toward business rule definition of: –How OCCSTDS data pulls forward into JDTA tab –Life-cycle impacts of OCCSTDS revisions on JDTA-based learning content

7 Summary of LO Module Rel 5.0 Spell check – Course, Module, Lesson, Section Sub-DPs for ILT (with RIAs) Before and after text for RRL links Update from EDE (no data loss) Copy and paste elements and resources Note: Details of functionality in backup slides (time permitting).

8 Summary of In-Process Functionality FEA support in CPM NETC tasked and funded priorities NAVSPECWARCEN funded AIM II enhancements MT Continuum lessons learned – ACRs in process Note: Details of functionality in backup slides (time permitting).

9 NAVEDTRA 139 Driving Changes to CPM - Post 5.0 NAVEDTRA 139 FEA Policy driving CPM functional requirements – FEA – Early screen prototypes under development to be screened by NETC later this summer Note: BCA support in CPM to follow.

10 Upcoming Tasked/Funded Changes Course Master Schedule (CMS) re-engineering per NETC N7/AIM FRB working group AIM Change Request Improved semi-automated functionality for repurposing traditional AIM LP/TG content curricula into LO Module * CTTL Report Capability in CPM Selection of traditional CTTL (and other tiered data) for semi-automated pre-conference population of JDTA data LP/TG portion marking to support classified curricula and supporting documents * Multiple DP, RIA, RRL tiered items at the same time.

11 Upcoming Tasked/Funded Changes (contd) Center-based filtering of selections in CPM CPM ‘gatekeeper’ functionality to reduce duplication and promote standardization Interfaces with BAH Atlas Pro toolset (LMS / ROCCE / Assessment Engine / Survey Engine) AIM II Modification TPP Migration from SQL Server to Oracle as backend database to leverage Navy enterprise license

12 Discussion of Potential Functionality Test Plan –Needs updating in AIM I and AIM II to support NAVEDTRA 132 requirement – Have input from CPPD which is a good start on potential ACR –Not covered in CPM/LO Module* Sub-elements in LO Module for self-paced rather than just ILT ‒How many levels? ‒LO Module ILT supports 4 total * Test Plan was not part of CPM/LO Module design, the thought at that time was that all test work would be done in QM Perception.

13 Questions?

14 Backup Slides

15 Summary of AIM I/II ACRs in Rel 5.0

16 Summary of AIM I/II ACRs in Rel 5.0 (contd)

17

18 Summary of CPM/LO Module Enhancements in Rel 4.1

19 Summary of CPM/LO Module Enhancements in Rel 4.1 (contd)

20

21 Summary of CPM/LO Module Enhancements in Rel 5.0

22 Summary of CPM/LO Module Enhancements in Rel 5.0 (contd)

23

24

25

26


Download ppt "New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and."