Presentation is loading. Please wait.

Presentation is loading. Please wait.

Muon analysis – PS and SPS data Started May 21, 2012.

Similar presentations


Presentation on theme: "Muon analysis – PS and SPS data Started May 21, 2012."— Presentation transcript:

1 Muon analysis – PS and SPS data Started May 21, 2012

2 -1 GeV/c beam rpc/PS_muon muon_14.f muon_20.kumac

3 -2 GeV/c beam

4 -3 GeV/c beam

5 -4 GeV/c beam

6 -5 GeV/c beam

7 -6 GeV/c beam

8 rpc/PS_muon muon_14.f muon_20.kumac -7 GeV/c beam

9 -8 GeV/c beam

10 -9 GeV/c beam

11

12 -10 GeV/c beam

13 +10 GeV/c beam

14

15 +8 GeV/c beam

16 +4 GeV/c beam

17 +6 GeV/c beam

18 SPS Beam June 5, 2012 -30 GeV/c

19

20

21 HW layer SW Layer 211213214215216217 1110514540729392 161592 7264 2726645962707476 3130232117191528 333266676667 71 3635545740235268 414079 778082 42418984534333 47461255461165 48477876777675 494867 68 6972 5049757475777677 53521514139914 Low efficiency layers in Middle HW layers already at 6.3 kV: 13, 19, 22, 45,50 Increased HV from 6.0 -> 6.3 kV: HW layers 31,33,36,42,47,49,53

22 -30 GeV/c with ~900/spill Rate: no problem

23 -30 GeV/c with lead foil scintillators and wire chambers in beam with ~1700/spill Rate: first layers inefficient

24 -40 GeV/c with ~950/spill -40 GeV/c with ~900/spill

25 -50 GeV/c with ~1650/spill -50 GeV/c with ~1650/spill

26 -50 GeV/c with ~1650/spill -50 GeV/c with ~1650/spill

27 SW Layer HW Layer 224226227228229 16156856576579 20197877747675 272678747576 3231671914117 33326768 6968 39388685807977 47467296 95 484779 80 504977 7877 535266 6263 Need adjustment: HW layers 16,20,76,32,33,39,50,53 Recently adjusted: HW layers 31,33,36,42,47,49,53

28 June 7, 2012 -120 GeV/c with ~250/spill -60 GeV/c with ~1250/spill

29 -60 GeV/c with ~1250/spill -60 GeV/c with ~1000/spill

30

31

32


Download ppt "Muon analysis – PS and SPS data Started May 21, 2012."

Similar presentations


Ads by Google