Download presentation
Presentation is loading. Please wait.
Published byAdele Mitchell Modified over 9 years ago
1
Muon analysis – PS and SPS data Started May 21, 2012
2
-1 GeV/c beam rpc/PS_muon muon_14.f muon_20.kumac
3
-2 GeV/c beam
4
-3 GeV/c beam
5
-4 GeV/c beam
6
-5 GeV/c beam
7
-6 GeV/c beam
8
rpc/PS_muon muon_14.f muon_20.kumac -7 GeV/c beam
9
-8 GeV/c beam
10
-9 GeV/c beam
12
-10 GeV/c beam
13
+10 GeV/c beam
15
+8 GeV/c beam
16
+4 GeV/c beam
17
+6 GeV/c beam
18
SPS Beam June 5, 2012 -30 GeV/c
21
HW layer SW Layer 211213214215216217 1110514540729392 161592 7264 2726645962707476 3130232117191528 333266676667 71 3635545740235268 414079 778082 42418984534333 47461255461165 48477876777675 494867 68 6972 5049757475777677 53521514139914 Low efficiency layers in Middle HW layers already at 6.3 kV: 13, 19, 22, 45,50 Increased HV from 6.0 -> 6.3 kV: HW layers 31,33,36,42,47,49,53
22
-30 GeV/c with ~900/spill Rate: no problem
23
-30 GeV/c with lead foil scintillators and wire chambers in beam with ~1700/spill Rate: first layers inefficient
24
-40 GeV/c with ~950/spill -40 GeV/c with ~900/spill
25
-50 GeV/c with ~1650/spill -50 GeV/c with ~1650/spill
26
-50 GeV/c with ~1650/spill -50 GeV/c with ~1650/spill
27
SW Layer HW Layer 224226227228229 16156856576579 20197877747675 272678747576 3231671914117 33326768 6968 39388685807977 47467296 95 484779 80 504977 7877 535266 6263 Need adjustment: HW layers 16,20,76,32,33,39,50,53 Recently adjusted: HW layers 31,33,36,42,47,49,53
28
June 7, 2012 -120 GeV/c with ~250/spill -60 GeV/c with ~1250/spill
29
-60 GeV/c with ~1250/spill -60 GeV/c with ~1000/spill
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.