Design of Bypass Systems Special thanks to Ed Meyer, who provided the framework for most of these slides
2
Introduction Goal #1: The Bypass must return fish quickly and safely to the river. Goal #2: The Bypass must effectively prevent debris and sediment from disrupting flow into and through the bypass system.
3
Introduction To accomplish these Goals, the screen and bypass must be designed to work hydraulically in tandem. A vigilant operations and maintenance plan must be in place to maintain these design conditions.
4
Screen and Bypass – Basic Layout
5
Bypass Design Optimum Design Combines: Biology - incorporates behavior and swimming ability. Engineering - “smooth and open” structural components that avoid abrupt light and hydraulic transitions and provide clear migration paths. Hydraulics – match design with behavior traits and swimming ability.
6
Bypass Design Optimum Design Anticipates: Hydrology – must provide adequate protection for fish and civil works for any flow condition. Operations – must allow simplest operations possible for given site conditions and constraints. Maintenance – must allow for efficient debris and sediment management.
7
Swimming Speed Ability Factors in Bypass Avoidance / Attraction ○ Sustained speed (minutes) ○ Length of screen ○ Number of bypasses required ○ Design for adverse water quality
8
Bypass Design and Juvenile Behavior Lighting Conditions ○ Intensity ○ Mercury Vapor Lights ○ Strobes ○ Clean Surface / Turbidity ○ Avoid Darkness
9
Dark Entrance
11
Bypass Design and Juvenile Behavior Hydraulic Changes o Acceleration should be less than 0.1 fps per foot (or 1 ft/s in 10 feet of travel). (NWFSC tests at McNary) o Deceleration – always avoid o Flow Separation – always avoid o Eddys – always avoid
12
Bypass Design and Juvenile Behavior Risks to Bypass Avoidance and Holding ○ Low velocity zones (predators) ○ Delayed Migration (smoltification) ○ Entrainment (through screens) ○ Impingement (on screens)
13
Bypass Design and Juvenile Behavior Conclusion – design features to avoid: Vertical wall and floor offsets - use tapers if necessary, but should not usually be necessary Abrupt light transitions Poor hydraulic conditions
14
Screens that may not require a formal bypass: River bank screens End of pipe screens Trap and haul
15
River Bank Screen Construction
16
River Bank Screen Completed
17
“Torpedo” style screen
18
Fixed drum screen – Priest Rapids
19
Features to note: easily retrievable, deep location, spray bar to move debris
20
Components of the Bypass System Entrance Conveyance System Outfall
21
Bypass Entrance
23
Bypass Flow Bypass flow should use from 5% to 10% of diverted flow. Bypass flow amount should be chosen to achieve all hydraulic objectives: ○ No flow deceleration ○ Limited flow acceleration (0.1 to 0.2 fps per foot) ○ Bypass pipe flow depth ○ Move sediment and debris
24
Bypass Entrance General Use grated or open-topped bypass entrance (including downwell). Provide access for inspection and debris removal Maintain 1.5 or 2 ft bypass width – bigger is better. Full depth bypass slot required for large screens, but smaller screens (less than 10 cfs or so) seem to work well with an orifice entrance (6” minimum into a 10” pipe) or ramped weir (Batelle tests).
25
Bypass Entrance General Minimum depth over bypass weir is 1 ft Can use bypass ramp to gradually increase velocity. Secondary screen dewatering – used to maintain velocity. Consider PIT detector installation
26
Old Screen Design - Bypass Entrance
27
Full Depth Slot vs.
28
Intermediate Bypass
30
Secondary Screens / Pumpback
31
Secondary Screening
32
Bypass Entrance and Secondary Screens at Upper Baker
33
Small Rotating Drum Screen – Bypass Entrance
34
Baker Lake Bypass
35
Break
36
Bypass Conveyance System Downwell design objectives: Energy Dissipation Rapidly move fish through this area Smooth transition to bypass pipe entrance
37
Energy Dissipation in the Downwell A bypass downwell should have a minimum water volume established by the following formula: where: = unit weight of water, 62.4 pounds (lb) per ft 3 = AWS flow, in ft 3 /s = energy head (water surface to water surface), in feet
38
Bypass Cross Section
39
Bypass Downwell
40
BIG bypass downwell (Wanapum)
41
Bypass Conveyance System Bypass Pipe criteria Full pipe or open channel flow? Depends. Avoid closure valves Provide smooth pipes and joints Pipe diameter – 10” minimum, but depends on bypass flow amount Flow velocity – keep fish and sediment moving through
42
Bypass Conveyance System Bypass Pipe criteria Full pipe or open channel flow? Depends. Avoid closure valves Provide smooth pipes and joints Pipe diameter – 10” minimum, but depends on bypass flow amount Flow velocity – keep fish and sediment moving through
43
Bypass Conveyance System Bypass Pipe material PVC Spun mortar in steel HDPE CMP – specific types, not all Roughened channel – If excess energy
44
Bypass Pipe
46
Bypass Energy Dissipation
48
Insert photo of rr bypass pipe and me
49
Bypass Pipe Joints
50
Use well compacted fill material in pipe trench. Avoid any protruding joint design, especially those that can catch debris.
51
This 25’ long rootball grew through a misaligned bypass pipe joint.
52
Bypass Conveyance System Pipe criteria (con’t) Alignment Avoid negative pressures No hydraulic jumps Sample facilities Access for inspection Properly compacted fill
53
Inspection
55
Bypass Conveyance System General Downwell design Pipe criteria Avoid pumping fish/bypass flow
56
Helical Pump
57
Bypass Outfall Concerns Minimize predation Minimize disorientation of juveniles Minimize impact on adults Bypass releases into open channels which return to the river
58
Old White River Outfall
59
New White River Outfall
60
Bypass Outfall Concerns Submerged versus Elevated outfalls Advantages and Disadvantages Alternative design
61
Bonneville Dam Outfalls Old versus New
62
Bypass Outfall Concerns Submerged versus Elevated outfalls Design Criteria Ambient velocity >= 4 fps Minimize air entrainment (submerged outfall) Minimize predator holding areas (eddies) Maximum impact velocity = 25 fps Outfall egress Avian protection
63
Avian Lines
65
Bypass Outfall Concerns Submerged versus Elevated outfalls Design Criteria Energy Considerations Too much hydraulic head Too little hydraulic head Mid-range
66
Bypass Outfall Concerns Submerged versus Elevated outfalls Design Criteria Energy Considerations Bypass Outfall design options Locate close to point of diversion Locate in areas with sufficient flow Induced high ambient velocity Trade offs to hardening the outfall
67
Starbuck Outfall
68
Stanfield Outfall