Iranian Gas Prospect H.E S.R.Kassaeizade Deputy Oil Minister and Managing Director of NIGC Presented by Turkey June.2008
3
Iranian Gas Prospect A Regional Perspective
4
Overview NIGC Organization 2008 Natural Gas Refineries & Dehydration Units Iran In 2007 NIGC Transmission Systems Pipeline Projects Compressor Stations Plans Underground Gas Storage Projects Gas Treatment Capacity LNG Production Investment on Gas Infrastructure Achievements in 2025 Advantages for Iranian Gas Market
5
NIGC Organization 2008 Oil Ministry NIOCNIGC 44 Sub Companies 8 Gas Ref. Co. 30 Province Gas Co. UGS Co. Eng & Dev Co..Transmission Co CNG Co. Commercial Co. TMS NIORDCNPC
6
Fajr Hashemi nejad Ilam South Pars Parsian Sarkhon Masjed Soleyman In OperationPlan Gavarzin Sarajeh Shorijeh Gonbadly Dalan Refinery Dehydration units Natural Gas Refineries & Dehydration Units Bidboland I Caspian Sea Bidboland II South Gasho
7
Natural Gas Production* (2001-2012) *(Received Natural Gas From NIOC)
8
Iran’s Share in the World Natural Gas Production (2007) 132 BCM
9
Domestic Natural Gas Sales (2001-2012)
10
Iran’s Share in the World Natural Gas Consumption (2007) 132 BCM
11
Iran in 2007 High pressure Gas Transmission pipelines 28000 Km Gas Distribution Networks 150000 Km No. of Natural Gas Consuming Cities 660 No. of Natural Gas Consuming Rural Areas 5700 Natural Gas Consuming Population 76% Share of Natural Gas in fossil fuels Basket 61% No. of Natural Gas Consuming Industries 18000 Export 5.6 BCM Import 6.2 BCM
12
Top 5 Gas Reserves Russia Iran Saudi Arabia United Arab Emirates Qatar 48 28 25 6 7 TCM
13
Natural Gas Sector Breakdown in 2007 BCM(%)
14
Principle 44 of I.R.of Iran Constitution All oil and Gas related activities except for Oil Industry Upstream will be privatized and offered to private sector. Principle 44 concerns with privatization of the natural gas market and thus formation of a financially stable and transparent markets, so as to ensure supply of good-quality natural gas at competitive prices to consumers. Iranian gas market will be opened to foreign investors as well.
15
NIGC Transmission Systems (Under Implementation) IGAT- V IGAT- VI IGAT- VII IGAT- VIII IGAT- IX IGAT- X IGAT- III Last segment (Saveh-Qazvin-Rasht) North-Northeast Pipeline Northwest Pipeline
16
IGAT 5 Length 504 km Diameter 56 inches’ Capacity 95 MCM/D Investment 2000 millions USD Compressor St. 5 Commencement date 2008
17
IGAT 6 Length 510 km Diameter 56 inches’ Capacity 95 MCM/D Investment 900 millions USD Compressor St. 5 Commencement date 2008
18
IGAT 7 Length 902 km Diameter 56 inches Capacity 110 MMCM/D Investment 2 billions USD Compressor St. 2 Commencement date 2009
19
IGAT 8 Length 1050 km Diameter 56 inches’ Capacity 100 MCM/D Investment 3.3 billions USD Compressor St. 10 Commencement date 2009
20
IGAT 9 Length 1860 km Diameter 56 inches’ Capacity 110 MMCM/D Investment 8 billions USD Compressor St. 17 Commencement date 2014
21
IGAT 10 Length 824 km Diameter 56 inches’ Capacity 65 MMCM/D Investment 635 millions USD Compressor St. 4 Commencement date 2009
22
(IGAT III)Last segment (Saveh-Qazvin-Rasht) Length 237 km Diameter 56 inches’ Investment 500 millions USD Source of gas South Pars Commencement date 2009
23
North-Northeast Pipeline Length 790+105 km Diameter 48,42 inches’ Investment 1.5 billions USD Compressor St. 6 Commencement date 2009
24
Northwest Pipeline Length 280 km,190 km Diameter 48,40 inches’ Investment 750 millions USD Compressor St. 3 Commencement date 2008
26
Pipeline Projects (2005-2025) Total (2025) 7 th Plan6 th Plan5 th plan4 th PlanFacilities -15,1613,149,10,11,124,6,7,8,9 Major Pipelines 29567 5100 111058262 40 to 56 inches Pipelines (km) 31938 55105511119948923 Other Pipelines (km) 61500 10600 2310017180 Total Length (km)
27
Compressor Stations Plans (2005-2025) Total (2025) 7 th Plan6 th Plan5 th plan4 th PlanFacilities 14030354035 Compressor Stations (NO.)
28
Underground Gas Storage Projects No. of Storages 3 Operating capacity 60 MMSCMD (3 Months) Investment USD 560 Million
29
Gas Treatment Capacity (Under Implementation) Refinery Capacity(MMSCMD) Commencement date Bidboland-II 57 2011 Ilam (Expansion) 3.4 2010 South Pars (Phases 6,7,8) 100 2008 South Pars (Phases 9,10) 50 2008 South Pars (Phases15,16,17,18) 100 2012 South Pars (Phases 19,20,21) 80 2013 South Pars (Phases 22,23,24) 40 2014
30
LNG Production Projects Capacity (mt/y) Commencement date Iran LNG 10 2011 Pars LNG 10 2012 Persian LNG 16.2 2013
31
Investment in 2007 Plans and Projects under implementation (Downstream) (28 Billions USD)
32
Investment on Gas Infrastructure (2005-2025) (Downstream) Total (2025) 7 th Plan6 th Plan5 th plan4 th PlanSection 247.58570.24745.3Distribution 524.6127.2126.1163.8107.6 Transmission (Pipelines,Compressor stations) 203.959.757.246.756.7 Refinery & Underground Storage 204154.231.3117.4Staff 1172.6421.7305218.7201 TOTAL (1000 Billion Rials( 12947312922 TOTAL (USD Billions( 1000 billions Rls
33
Achievements in 2025 The second natural gas producer in the world 10 percent share in global natural gas trade, through pipeline or by LNG Domestic pricing deregulation on the track Natural gas, dominant energy as feed stock and fuel Privatization based on principle 44 of constitution completely achieved