North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.

Similar presentations


Presentation on theme: "North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013."— Presentation transcript:

1 North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013

2 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides; more than 21,000 new parking spaces Enhanced Bus Network & Transit Hubs (FastConnects) Redevelopment of Denver Union Station 57 new rail and/or BRT stations Opportunities for Transit Oriented Communities 2

3 FasTracks Status West Line first FasTracks line to open – April 26, 2013 Denver Union Station – 89% complete East Line/Gold Line/NW Rail Segment One – 50% complete US 36 BRT – under construction, bus service begins 2016 I-225 Line – under construction, opens 2016 Free MetroRide (formerly the Circulator) to open this summer

4 FasTracks Snapshot One line opened, construction underway on four rail lines, BRT, Union Station Continue to implement $5 billion across the region Economic driver for the region –$2.6 billion spent and injected into the local economy since 2005 –600 construction jobs during West Rail Line construction –2,500 direct and indirect jobs during Eagle P3 construction Pursue any possible funding alternatives to complete FasTracks sooner rather than later RTD is committed to completing the whole FasTracks program

5 North Metro Rail Line 18.5 Miles Electrified Commuter Rail 8 Stations Parking spaces 4,020 – opening year 8,500 – 2035 Single track with multiple passing tracks Serves Denver, Commerce City, Thornton, Northglenn, Adams County

6 Complete all work in a safe manner to protect the construction workers and the public. Complete all or a portion of North Metro Rail Line beyond the previously announced terminus at 72nd Ave. Integrate within the Commuter Rail Network currently underway on Eagle Project. Comply fully with the Record of Decision. Goals for North Metro

7 Meet Disadvantaged Business Enterprise (DBE) goals established by the RTD Civil Rights Dept. and demonstrate commitment to utilize Small Business Enterprises and WIN Program Offer added-value solutions to deliver the FasTracks program. Goals for North Metro

8 Design/build with three phases: –Union Station to 72 nd Ave –72 nd Ave to End of Line (Hwy 7) –SE, SW & Central Extensions Willing to include related stakeholder projects (non-federal) to lock in price. Stakeholders to pay for these projects Award based on best value with emphasis on creativity and innovation within financial capacity RFP Scope

9 Civil Works (grading, drainage, utilities, roadway, traffic) Bridges and Structures Stations Right-of-way –RTD Responsibility from DUS to 72nd Avenue –Contractor assistance on 72nd to SH7 (End of line) Civil Elements

10 Train Control System Communications and Control System Traction Electrification System System-wide Electrical Systems Integration Systems Elements

11 Civil Rights DBE Goal 23%Design 21% Construction WIN Program Goals 4% Professional Services 8% Skilled Craft SBE Utilization Contractor to prepare plan to maximize

12 RFP Schedule Advertised RFP – June 28, 2013 Pre-proposal briefing – July 8, 2013 – 250 attendees Proposers/Stakeholders Questions and Comments due – August 12 Issue Final Addendum with Response to Questions and Comments – August 26 Proposals Due – Sept 23

13 RFP Schedule con’t Evaluation Committee presents recommendation to GM – late October, 2013 GM/Staff recommendation to the FasTracks Monitoring Committee – November 5, 2013 Board Approval/Notice of Award – November 26, 2013 Financial Close – December 19, 2013 Notice to Proceed Phase 1 – December 19, 2013

14 Stakeholder Participation Representatives from Denver, Adams County, Commerce City, Thornton, Northglenn, CDOT and NATA will serve on evaluation committee. Confidentiality is required. Authorized Stakeholders cannot share information with anyone outside of the Stakeholders Group until after November 5

15 North Metro Rail Line Info Brenda Tierney, Public Information Manager 303-299-2401 northmetroinfo@rtd-denver.com Contact Information