Presentation is loading. Please wait.

Presentation is loading. Please wait.

KYTC Bridge Preservation and Maintenance Program David Steele, P.E. Branch Manager for Bridge Preservation.

Similar presentations


Presentation on theme: "KYTC Bridge Preservation and Maintenance Program David Steele, P.E. Branch Manager for Bridge Preservation."— Presentation transcript:

1 KYTC Bridge Preservation and Maintenance Program David Steele, P.E. Branch Manager for Bridge Preservation

2 Bridge Inventory 9,025 = Number of State Maintained Bridges 632 = Structurally Deficient (7%) 4,709 = Number of Local Maintained Bridges

3

4

5

6

7 District Bridge Crews

8

9

10 Bridge Preservation Conference

11 Central Office Staff Branch Manager (P.E.) Chief Bridge Inspector Contract Section–Repairs (3 people) Paint (1 person) Scour and Preventive Maintenance (1 P.E.) Load Rating Engineers (2 P.E.’s) Ohio and Big Sandy River Bridges Manager (1 P.E) Inventory – Pontis System Administrators (2) Snooper Manager Administrative Specialist

12

13 Before

14 After

15

16

17

18

19


Download ppt "KYTC Bridge Preservation and Maintenance Program David Steele, P.E. Branch Manager for Bridge Preservation."

Similar presentations


Ads by Google