Presentation is loading. Please wait.

Presentation is loading. Please wait.

CURRENT AIRSPACE MANGEMENT PROCEDURES AND LARA IMPLEMENTATION Traineeship report 15 October 2010.

Similar presentations


Presentation on theme: "CURRENT AIRSPACE MANGEMENT PROCEDURES AND LARA IMPLEMENTATION Traineeship report 15 October 2010."— Presentation transcript:

1 CURRENT AIRSPACE MANGEMENT PROCEDURES AND LARA IMPLEMENTATION Traineeship report 15 October 2010

2 Content Objectives Current Airspace Management Procedures Benefit of LARA implementation in the near future. Conclusion LARA Civil perspective Military perspective General overview

3 Introduction Nowadays airline traffic is increasing very rapidly throughout the world. The expected growth of European air traffic requires close civil/military cooperation.

4

5 Semmerzake ATCC Air Traffic Control Mil ASM in BEMil ACC Civil/Mil coordination Defence and Support trainingsecurityFlight Supportadministrativefinancial aspectMaintenancecommunication quality of techniques

6 Main Tasks Military Airspace Management in BE Ensure flight safety of Mil Traffic around BE Provide real-time civil/military coordination Distribution of NOTAMs Search and Rescue operations Schooling and Training of Air Traffic Controllers

7 ASM level 2 Pre- prepared AUP “Flying window” AMP II Day -to- day Allo cati on D-1

8 ASM level 3 Real-time (de-) activation Releases of airspace to civilians FUA – 3 “Plus” Manual data input

9 Belgocontrol ATCC, Brussels ACC SupervisorAir traffic managerEast ATCOWest ATCOApproach for EBBR Tower SupervisorClearance DeliveryGround controlRunway control Air Component unit Supervisor2 assistantsSAR centre / RCCAMC

10 Main tasks Area and approach control service Airspace management Aerodrome control service AIS and Meteo CNS Training of ATCOs

11 ASM level 2 Receiving the AUP R e c e i v i n g t h e A U P Double work via Phone/Fax/E-mail via Phone/Fax/E-mail Reservation of areas Manual Data Input

12 ASM level 3 the real-time visual status of airspace The further updates and real-time releases of airspace

13 LARA Local and sub-regional airspace management support system Airspace planning (ASM level 2) Online and in real time Airspace and CDR display Functionalities to analyse Civil-military coordination features Automation of AMC tasks Airspace status (ASM level 3) Real-time (de-) activation of airspace Tactical civil-military coordination Common situation awareness ASM Data Collection Manual/ automated data export and import Data storage Data validation

14 Conclusions Necessity of special system for common coordination Improvement of civil/mil cooperation by LARA usage. FUA Concept application.

15 Questions???


Download ppt "CURRENT AIRSPACE MANGEMENT PROCEDURES AND LARA IMPLEMENTATION Traineeship report 15 October 2010."

Similar presentations


Ads by Google