Presentation is loading. Please wait.

Presentation is loading. Please wait.

HEADER / FOOTER INFORMATION (SUCH AS NORTHROP GRUMMAN PRIVATE / PROPRIETARY LEVEL I) DOD Spectrum Symposium October 15, 2009 Mark S. Adams Principal Architect.

Similar presentations


Presentation on theme: "HEADER / FOOTER INFORMATION (SUCH AS NORTHROP GRUMMAN PRIVATE / PROPRIETARY LEVEL I) DOD Spectrum Symposium October 15, 2009 Mark S. Adams Principal Architect."— Presentation transcript:

1 HEADER / FOOTER INFORMATION (SUCH AS NORTHROP GRUMMAN PRIVATE / PROPRIETARY LEVEL I) DOD Spectrum Symposium October 15, 2009 Mark S. Adams Principal Architect Networks & Communications Northrop Grumman Information Systems Chantilly, VA ms.adams@ngc.com

2 HEADER / FOOTER INFORMATION (SUCH AS NORTHROP GRUMMAN PRIVATE / PROPRIETARY LEVEL I) 2 Operational Efficiencies – “It’s not just for Hollywood anymore”

3 HEADER / FOOTER INFORMATION (SUCH AS NORTHROP GRUMMAN PRIVATE / PROPRIETARY LEVEL I) 3 Legacy Spectrum Strategies need “UPGRADE” Shared Services Platforms create “Efficiency” INTRODUCTION | NORTHROP GRUMMAN PROPRIETARY – LEVEL 1 | 3

4 HEADER / FOOTER INFORMATION (SUCH AS NORTHROP GRUMMAN PRIVATE / PROPRIETARY LEVEL I) 4 Infrastructure Highly Available Networking for “ always on ” network infrastructure Secure Campus Wireless Saturation to enable “ anywhere-any time ” presence Shipboard connectivity though a Distributed Antenna System & Cellular Beaming Employee RFID Badges Streamline employee entry/exit to eliminate congestion at gate Leverage RFID capabilities to improve timekeeping accuracy Work Package Tracking Wired rugged kiosks, barcode scanners, and rugged tablets Barcoding of in progress work packages and foreman ’ s orders Real-time visibility thru reports to find or expedite critical jobs Asset & Material Tracking Increased visibility of materials and utilize mobile device for verification Reduce pick time at storage location and lost material / re-fabrication Mobile Quality Inspection One time inspection input on-site - reduce paperwork Increase communication and design specs and reduce data package consolidation time Supervisor Mobile Information Provide real time production information & automate task assignment Reduce data input errors and redundancy - reduce paperwork A Comprehensive Mobile Technologies Portfolio leveraging NGC best practices The “Shipyard of the Future” – Newport News Concept Drivers: The “Cyber-Shipyard” - Gulf Coast Applied Wireless/Mobility Solutions


Download ppt "HEADER / FOOTER INFORMATION (SUCH AS NORTHROP GRUMMAN PRIVATE / PROPRIETARY LEVEL I) DOD Spectrum Symposium October 15, 2009 Mark S. Adams Principal Architect."

Similar presentations


Ads by Google