June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS Purpose, Scope CHERY.R.

Similar presentations


Presentation on theme: "June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS Purpose, Scope CHERY.R."— Presentation transcript:

1 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS Purpose, Scope CHERY.R

2 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS PURPOSE –Today the Timing (SPS, LHC ) is distributed from the BT864 –To manage the new injection system two new racks will be installed in the C.C.C

3 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS SCOPE –Distribution rack: A) - GMT B) - REV C) - P-P D) - LHC E) – PS (CPS, PSB, LEIR, ADE) F) – Reflective Memory

4 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS SCOPE –Control rack: 1)- To drive the FOXCOM modules in the distribution rack 2)- To control this distributions by means of the Mil-1553 field bus

5 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS SCOPE –Cabling: 1)- Optical fibre connections from the distribution rack to the C.C.C Optical Fibre Star Point 2) - VH4 cable from VME crate 3) – BNC or LEMO connections to and from this two racks

6 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup DISTRIBUTION RACK P-P FOXCOM MODULES SPS, BT864, BT865, BT866 REV FOXCOM MODULES SPS, BT864, BT865, BT866 GMT FOXCOM MODULES FROM CONTROL RACK P-P FROM CONTROL RACK REV FROM CONTROL RACK GMT MNR PS FOXCOM MODULES CPS, PSB, LEIR, ADE TO / FROM CCC OPTICAL FIBRE STAR POINT OPTICAL MODULES CRATE REFLECTIVE MEMORY LHC

7 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup CONTROL RACK G64 REV GPSCCR, BC=8, RT=4 G64 P-P GPSCCR, BC=8, RT=2 G64 PLS PLS OUT P-P IN TFBTFB TFBTFB REV IN TO DISTRIBUTION RACK GPSCCR VME CRATE TG8TG8 CPUCPU BC8BC8 DELAY’S TOTIV’s GMT TOTIVTOTIV TORIVTORIV G64 GMT GPSCCR, BC=8, RT=8 GMT FROM MTG’s SWITCH MIL-1553 1C/GPSCCR PLS IN AMPLIFIER GMT TO DISTRIBUTION RACK P-P TO DISTRIBUTION RACK REV


Download ppt "June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS Purpose, Scope CHERY.R."