Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki
2
Federal Aviation Administration DCL Trials Update DTAP Development Work Ongoing: -Requirements firming towards June 7 CDR -FAA/Thales bi-weekly TIMs ongoing -Facility rep CHI Working Session #1 Complete -CHI modifications complete for CHI WS #2 (June 5-6) -DTAP delivery scheduled for Aug 17 delivery to FAATC MEM Coordination Activities: -5/8 visit to MEM to review DTAP display and equipment sizing/placement options with ATC and Tech Ops reps -Preferred equipment locations sent to ESA Tech Ops CM for permanent assignment by MEM Tech Ops Management -Reviewed Draft Training and Trials Planning materials/logistics
3
Federal Aviation Administration 3 DTAP 15” display to reside beside TDLS 15” display (base mount) Maintains clear visibility to airfield and gate areas from CD and SUP positions NATCA/ATC collaboration on display location/placement Desktop Keyboard/Mouse MEM DTAP Monitor Clearance Delivery Position BONUS ? – CAN YOU GUESS WHO THIS IS? DTAP TDLS Strip Printer
4
Federal Aviation Administration MEM - Space For DTAP Automation Rack and FTI Communications Connections – Preferred Option #1 4 T1212 Electronic Equipment Room FTI connections to basement Demarc Contractors Allowed 24 Hour Access with Badge/Proxy Empty 19” Equipment rack cabled to power in T1212 Would fit DTAP automation CPU if available Otherwise space for a new DTAP 19” rack space is required in T1212 Fiber, CAT5, Copper Cabling Options to Tower
5
Federal Aviation Administration MEM - Space For DTAP Automation Rack and FTI Communications – Alternate Option #2 5 Basement Communications Room Existing and New Rack Space Options ID’ed Contractors Allowed 24 Hour Access with Badge/Proxy FTI Demarc Location DTAP Communications to ZME HADDS and ARINC/SITA CSPs Fiber Only Option to Tower
6
Federal Aviation Administration DCL Trials Update FTI/ISS Architecture: -Initial Trials SCAP Documentation package complete -Meeting with ISSM office to review docs pending -FTI architecture design complete (part of ISSM Doc package) -NAIMES issued DTAP IP assignment complete -IPs sent to HADDS configuration team for inclusion in July build/field ZME deployment FAA-FDX MOU Draft Review complete: -FDX review of language complete -Agreement signatures pending -Same MOU template expected with UAL and DAL
7
Federal Aviation Administration DCL Trials Update Trials SRMD Approved: -Final signatures complete -MEM, EWR, ATL ATC panel representation -Attached to Test NCP Case Files Test NCP Update: -(5) Technical, Space, Power, HADDS, Rev # -Test plan documents approved and baselined with CMRT -HCS Rev # and HADDS interface NCPs approved via CCB -New FDIO Echo Port Test NCP in development (CMRT baseline on June 6)
8
Federal Aviation Administration DCL Trials Update Trials CSP Service: -Boeing/ARINC/FAA contract pending -POP begins 6/1 – thru 12/1 -Initial pDTAP AFN testing possible by mid-June via ARINC -Boeing/SITA Contract status pending (mid-July?) -KMEM, KACY log in addresses assigned -FAATC Data Comm lab FNTB-FEP/CSP connectivity pending
9
Federal Aviation Administration
10
Federal Aviation Administration