Download presentation
Presentation is loading. Please wait.
Published byShona Blake Modified over 9 years ago
1
Legislative Update Northgate Energy Assessor Accreditation Scheme Continual Professional Development Version 2.0, Issue Date: 10 th September 2008 CPD Hours: 1
2
CPD – Legislative Update v2.0 10/09/08 (9.82) Background to EPCs Energy Performance of Building Directive (EPBD) was passed as a result of EU ratification of the Kyoto protocol EPBD aims are to: Define a methodology of calculating the energy performance of buildings Set minimum requirements for energy performance on new buildings / those under major renovation and large existing buildings Provide information to purchasers / tenants about the relative energy efficiency of a property (dwelling or non-dwelling). Relative means against a benchmark national value.
3
CPD – Legislative Update v2.0 10/09/08 (9.82) UK Implementation of EPBD The British Parliament and the Regional Assemblies are implementing articles of the EPBD via a number of areas: Climate change bill Publication of national calculation methodology SAP for new dwellings Rd SAP for existing dwellings SBEM / DSM for non dwellings DEC for Display Energy Certificates Building regulations approved documents (L1a & b, L2a & b, F) include interpretation of EPBD articles Housing Act 2004 (related to HIPs) Statutory instrument for England &Wales is the “Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007”. There is an equivalent instrument for Northern Ireland and Scotland.
4
CPD – Legislative Update v2.0 10/09/08 (9.82) Energy Performance of Buildings - Exclusions Buildings used primarily or solely as a place of Worship Temporary buildings (planned time of use of two yrs or less) Industrial sites, workshops and non residential agricultural buildings with low energy demand Stand alone buildings of floor area less than 50m 2 that are NOT dwellings The EPC does NOT need to be supplied if the construction of the building has not been completed EPCs are not required if the building is to be demolished (this has to be demonstrated via the various building regs / planning permission)
5
CPD – Legislative Update v2.0 10/09/08 (9.82) Definitions Who is a buyer or tenant? Someone who requests information about a building from the relevant person or their agents for the purpose of deciding whether to buy or rent the building Someone who requests to view the building for the reason as above Someone who makes an offer (oral or written) to buy or rent the building A building is “a roofed construction having walls, for which energy is used to condition the indoor climate; a building may refer to the building as a whole or parts thereof that have been designed or altered to be used separately”
6
CPD – Legislative Update v2.0 10/09/08 (9.82) EPC Timetable: England & Wales (Domestic) All domestic properties for sale require an EPC before completion The EPC is now valid for 3 years as per the September changes in regulations - NOTE THIS WAS 12 MONTHS All domestic properties require an EPC ON CONSTRUCTION Related to building regulations On-construction energy assessors must produce the EPC From 1 st October 2008 all domestic properties FOR SALE require an EPC even if they are already on the market and did not previously need an EPC From 1 st October 2008 all domestic properties FOR RENT require an EPC on first change of tenancy. This is private and social sectors The EPC is valid for 10 years http://www.communities.gov.uk/documents/planningandbuildin g/pdf/circular062008.pdf for full details of the amendments dated 4 th September 2008 http://www.communities.gov.uk/documents/planningandbuildin g/pdf/circular062008.pdf
7
CPD – Legislative Update v2.0 10/09/08 (9.82) EPC Timetable: England & Wales (Commercial) Phased implementation All non domestic buildings for sale, rent or on- construction more the 2500m 2 require an EPC The requirement for all buildings will be introduced from 1 st October 2008 (on a trigger event) The EPC is valid for 10 years Non domestic (commercial) energy assessors must produce the EPC Three levels of assessor (3,4 &5) for different complexity of building Display Energy Certificates (DECs) are also part of the EPBD for public buildings and are required from October 2008
8
CPD – Legislative Update v2.0 10/09/08 (9.82) EPC Timetable: Northern Ireland Statutory Instrument is the “The Energy Performance of Buildings (Certificates and Inspections) Regulations (Northern Ireland)” 2008 http://www.opsi.gov.uk/sr/sr2008/pdf/nisr_20080170_en.pdf http://www.opsi.gov.uk/sr/sr2008/pdf/nisr_20080170_en.pdf Commencement dates are: Dwellings: For Sale - 30th June 2008 New builds - 30th September 2008 Rental - 30th December 2008 Buildings other than Dwellings: For Sale - 30th December 2008 New Builds - 30th September 2008 Rental - 30th December 2008
9
CPD – Legislative Update v2.0 10/09/08 (9.82) EPC Timetable: Scotland Statutory Instrument is the “The Building (Scotland) Amendment Regulations 2007” http://www.opsi.gov.uk/legislation/scotland/ssi2007/ssi_20070 166_en_1 http://www.opsi.gov.uk/legislation/scotland/ssi2007/ssi_20070 166_en_1 Commencement dates are: Dwellings: New builds – 1 st May 2007 For Sale – 1 st December 2008 –The EPC is provided with the Home Pack issued under the Single Survey Rental – 4 th January 2009 Buildings other than Dwellings: New builds – 1 st May 2007 For Sale – 4 th January 2009 Rental – 4 th January 2009 A separate CPD module will be issued for Scotland in Autumn 2008
10
CPD – Legislative Update v2.0 10/09/08 (9.82) Energy Assessors & EPCs An EPC must be “issued by an Energy Assessor who is accredited to produce and EPC for that category of building” An in England, Wales & Northern Ireland an Energy Assessor “must be a member of an accreditation scheme approved by the Secretary of State”. In Scotland an assessor must belong to a protocol organisation (Northgate is one) Accreditation schemes are limited to the categories of buildings for which members may produce EPCs Accreditation schemes MUST ensure its members: Are fit and proper persons to undertake energy assessments Operate under an appropriate code of conduct Are Qualified to undertake energy assessments Have suitable indemnity cover And in addition they MUST Operate procedures that ensure consistency and accuracy of assessments Have active QA procedures Facilitate resolution of complaints against members Operate disciplinary procedures Maintain a register of members Is an organisation that has financial stability / probity
11
CPD – Legislative Update v2.0 10/09/08 (9.82) Energy Assessor Obligations Each EA has been issued with the code of conduct, T&Cs, complaints and disciplinary documents on accreditation The Accreditation Scheme will monitor DEAs against the code Via householder survey, accompanied visits and complaints What is in the Code of Conduct? Covers professional behaviour, confidentiality of information, discrimination, essential items such as PII, records and CPD DEAs must inform the scheme if any of their details or circumstances change DEAs must only work within their level of technical competence Must notify the scheme of ALL complaints and escalate to us if it can not be resolved Must notify the scheme if you have a concern about another member Covers conflict of interest when conducting an Energy Assessment
12
CPD – Legislative Update v2.0 10/09/08 (9.82) Responsibilities: The Energy Assessor The Energy Assessor shall Follow the Code of conduct Comply with the complaints and disciplinary policies (and any decisions arising from them) Keep “full and detailed” records of work activities as a EA for the duration of membership AND for 6 year thereafter Records / other documentation may be requested (and must be provided) by the scheme Notify us if you become a member of another Scheme (or cease to be a member) Keep up to date and develop expertise via CPD / lifelong learning Arbitration is allowed for via the Chartered Institute of Arbitrators Allow the scheme (or representatives) to conduct quality audits on EPCs including accompanied and re-visits
13
CPD – Legislative Update v2.0 10/09/08 (9.82) Responsibilities: Northgate Scheme Northgate shall Operate the scheme in accordance with the appropriate government guidelines Provide the rdSAP software and lodgement mechanism in accordance with the register provider In accordance with Data Protection laws hold information about EAs We are a Data Controller and take great care of your personal data Our accreditation scheme is certified to ISO27001 standard
14
CPD – Legislative Update v2.0 10/09/08 (9.82) Questions 1.What are the origins of the introduction of EPCs? 2.Which government departments are responsible? 3.How long are domestic “For Sale” and “rental” EPCs valid for in England & Wales? 4.What is the enforcement date for rental properties in England & Wales, Northern Ireland and Scotland? 5.List 3 examples of properties excluded from EPC regulations 6.Explain the difference between an Asset rating and an Operational rating Name:Assessor No: Please complete the answers to the questions and forward to the Northgate Accreditation scheme (dea@northgate-is.com)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.