Action Plan
3
Action Plan CIE Project 2010-11 By Kamran Ansari By Mr. Kamran Ahmed Ansari The City School PAF Chapter, Karachi Pakistan
4
Action Plan CIE Project 2010-11 By Kamran Ansari Computer Studies 7010/2 – CIE Project Importance: Total Maximum Marks 50 = 100 %, 25 % marks will be included in Final Result. Submission by April 15, 2010
5
Action Plan CIE Project 2010-11 By Kamran Ansari Computer Studies 7010/2 – CIE Project www.cie.org.uk Page 4 Syllabus Computer Studies 7010 year 2011
6
Action Plan CIE Project 2010-11 By Kamran Ansari Road to Target Students have to follow all phases of SDLC To complete the Project work. SDLC stands for System Development Life Cycle.
7
Action Plan CIE Project 2010-11 By Kamran Ansari Stages of Project work: Problem Definition Analysis Design Implementation Testing Documentation Evaluation and Future Development
8
Action Plan CIE Project 2010-11 By Kamran Ansari Marks Distribution for Project work
9
Action Plan CIE Project 2010-11 By Kamran Ansari 1. Problem Definition & Analysis Phase Students have to Choose a topic for CIE Project for Example Stock Control System, Inventory Control System, Flight Reservation System etc. To select the topic Students may use Internet, Sample Projects of previous years from campus library. Soft Copies are also available to view in computer Lab. I as project coordinator will always be available for support and guidance.
10
Action Plan CIE Project 2010-11 By Kamran Ansari 2. Design Phase In design phase students have to write overall plan for the system design. Description of method of solution Hardware requirements Software requirements System Flowcharts
11
Action Plan CIE Project 2010-11 By Kamran Ansari 3. Implementation Phase In Implementation phase students have to implement the designed plan practically using computer languages, Database & Reporting Software etc. Method of Solution related to problem Program Coding Accurate method of solution.
12
Action Plan CIE Project 2010-11 By Kamran Ansari 4. Testing Students have to test the system thoroughly with great details to minimize the errors Test Strategy must be very clear and each aspect of testing checked. Test results must be shown Testing plays very important role to run a software efficiently in the organization.
13
Action Plan CIE Project 2010-11 By Kamran Ansari 5. Documentation Documentation is the compilation of your Project work in form of hard copy. It must be organized in a sequence which provides an easy way to understand your product. Color print outs can only be used for Section separator (Project stage’s main heading) of the project. Binding must of same pattern for all students. Two types of Documentation have to be produced 1. Technical Documentation 2. User Guide
14
Action Plan CIE Project 2010-11 By Kamran Ansari 6. Evaluation Evaluation of the software should be written in such a way that it can be implemented in future. Evaluation should include future enhancement of the software too.
15
Action Plan CIE Project 2010-11 By Kamran Ansari TOPICS Months 1234567 WEEK1WEEK2WEEK3WEEK4WEEK1WEEK2WEEK3WEEK4WEEK1WEEK2WEEK3WEEK4WEEK1WEEK2WEEK3WEEK4WEEK1WEEK2WEEK3WEEK4WEEK1WEEK2WEEK3WEEK4WEEK1WEEK2WEEK3WEEK4 Investigation Analysis Output & Input Designing Coding & Troubleshooting Testing Implementation & Installing Testing & Debugging User Training Documentation
16
Action Plan CIE Project 2010-11 By Kamran Ansari Project Assessment scheme Individual Candidate’s assessment record sheet. Student’s work is finally assessed in accordance with the following points mentioned in the table below.
17
Action Plan CIE Project 2010-11 By Kamran Ansari Project Assessment scheme
18
Action Plan CIE Project 2010-11 By Kamran Ansari Project Assessment scheme
19
Action Plan CIE Project 2010-11 By Kamran Ansari Project Assessment scheme
20
Action Plan CIE Project 2010-11 By Kamran Ansari Project Assessment scheme
21
Action Plan CIE Project 2010-11 By Kamran Ansari Resources: 1.Sample Projects of previous years 2.Soft copies of previous year projects 3.www.cie.org.ukwww.cie.org.uk 4.www.pbworks.com\Kamranwww.pbworks.com\Kamran 5.Search engines like www.google.com
22
Action Plan CIE Project 2010-11 By Kamran Ansari Conclusion: The purpose of this presentation is to enable students complete their CIE Project on time following the standards of CIE. Students should be independent learners. They should have enough confidence to have innovative ideas and successfully implement the same ideas. Try to utilize all resources for the assistance to your project. Very important thing that students can consult any time for their project work with the teacher.
23
Action Plan CIE Project 2010-11 By Kamran Ansari “Happiness is normally, a rebound from hard work” Thank you