Presentation is loading. Please wait.

Presentation is loading. Please wait.

California High Speed Rail Downtown Alignment Issues Elevated Option - -Visual - -Noise - -Land Development Underground - -Cost - -Construction Risk.

Similar presentations


Presentation on theme: "California High Speed Rail Downtown Alignment Issues Elevated Option - -Visual - -Noise - -Land Development Underground - -Cost - -Construction Risk."— Presentation transcript:

1

2 California High Speed Rail

3 Downtown Alignment Issues Elevated Option - -Visual - -Noise - -Land Development Underground - -Cost - -Construction Risk - -Statewide Equity 2 Park Ave San Carlos St The Alameda Almaden Blvd San José Convention Center HP Pavilion PROPOSED BART TUNNEL Diridon Station Tamien Station 1 87 280

4 Coyote Valley/101/Bailey Coyote Valley/101/Bailey

5 Coyote Valley/101/Bailey

6 Monterey Road Corridor Monterey Road Corridor

7

8 Monterey Road near Capitol Expressway Monterey Road near Capitol Expressway

9

10 Communication Hill Communication Hill

11

12 Alma Avenue Alma Avenue

13

14 Tamien Station Tamien Station

15

16 Bird Avenue at 280 Bird Avenue at 280

17

18 Bird Avenue at Auzerais Bird Avenue at Auzerais

19

20

21 Diridon Station Diridon Station

22

23 The Alameda The Alameda

24

25 Santa Clara Street Santa Clara Street

26

27 Highway 880 Highway 880

28

29 California High Speed Rail I-280 BridgeI-280 Signature Bridge

30 Process Milestones Complete Visual Design Guidelines Oct 5 Community Meeting Oct TBD City Council Meeting Nov 15 CHSRA Board Meeting Dec TBD

31 California High Speed Rail


Download ppt "California High Speed Rail Downtown Alignment Issues Elevated Option - -Visual - -Noise - -Land Development Underground - -Cost - -Construction Risk."

Similar presentations


Ads by Google