1
Primary & Sub deduct surveys Andrew Stone/Chris Warner
2
2 How many? National Grid – Approx 1,000 arrangements (ie: primary meters) Approx 2,230 sub deduct meters Presentation provided by NGD at UNC Distribution Workstream in April 2007 on considerations/issues associated with possible adoption National Grid does not own or operate any of the supply pipework downstream of the primary meter ECV.
3
3 Pre Collected Data
4
4
5
5 Ofgem aspirations Requirement to survey all sub-deduct networks in Britain GDPCR Final Proposals – 3 rd December 2007 Allowance for surveys To be completed over 2008/9 and 2009/10 formula years Purpose to gather technical data relevant to potential re-engineering and future adoption of these networks by GDNs To inform the anticipated DBERR review of the relevant exemption order (Statutory Instrument 1996/449) due to expire on 1 st March 2011 Final report to Ofgem 1 st April 2010 Method for conducting work dependant on resources and experience of each GDN
6
6 Next steps National Grid is considering the most effective way in which it is able to meet Ofgem’s requirements Options for Survey resourcing are currently under consideration. Use of direct labour. Shipper liaison to be facilitated by ‘customer’ department. Outsourcing to contractors by competitive tender. Contractor responsible for all Shipper/Supplier/Customer interfaces. A method of capturing data in a consistent way needs to be developed Confirm ownership of Primary/Sub-deduct Supply Point/User Consistent method of contact with end-consumer needs to be agreed (contact letters, etc) Extent of NGD liaison with Shipper/Supplier of key importance
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.