Wireless Sea Measurement Unit Intermediate Report A Plan for Aarne Halme Project Juha Vanhalakka Erkka Mutanen
2
Contents O Project Schedule Reprise O Code O Hardware O Components Purchased O Building Board i-iv O Ready Chip O Casing O Mechanics O After Installation
3
Project Schedule Reprise O Project Plan25.09. O Progress Report30.10. + electronics ready, code running O Demo A20.11. + casing ready, code ready O Demo B27.11. + mounting prototype done O Documentation done10.12.
4
Code O Xbee communication is working O Measurement data logging incomplete O No tests done on the XBee chip O UI Code is late O Challenges: learn PHP from the start, learn JavaScript from the start O Also, possible changes in UI makes the programming take more time and more difficult
5
Hardware O Hardware is on time O We have a lab worker making us a seabed mount steel tube O Todo : power electronics dimensioning, (battery capacity against solar panel power) O Budget ?
6
Components Purchased O We have ordered all parts from Farnell and Digikey O We have a WIKA hydrostatic pressure sensor O We have a PT100 temperature sensor O We have an industrial grade casing from Ensto O List of components in Excel sheet
7
Building Board I
8
Building Board II
9
Building Board III
10
Building Board IV
11
Ready Chip O 10 x 12 cm O Build start Oct 13 th O Finished Oct 22 nd O Includes recharging circuit and Xbee radio I/O connectivity O Juha drew the board O Built 2 identical ones for parallel testing O Here it is:
12
Casing
13
Mechanics
14
After Installation: