1 LBDS commissioning – MKD tests Viliam Senaj, 11/12/2013

2 MKD/B2 tests HV tests (up to 5 TeV) without major problems: – noisy Trigout on Gen. H (up to 5V noise signal) – replaced chassis with PTU&PTC – Noisy output on one PTU of Gen. D – replaced PTU – Triax cable connectors on Gen. B – difficult to insert – replaced cables – Triax cable and 3 kV HV PS cable not fully inserted on Gen. E (27/11) No abnormal sparking activity observed - surveillance of retriggering pick-ups Cts2a&b – with the same settings for all generators DC 7TeV test: erratics on B (3 erratics 2 GTOs broken), D (6 erratics no damage), G (1 erratic no damage), J (3 erratics 2 GTO broken), N (2 erratics no damage) 48 hours ramp test: 10min 400 GeV; 10 min ramp to Emax; 90 min at Emax and (12h 6.5 TeV, 12h 6.75 TeV, 24h 7 TeV) - OK (without B&J)

3 Spontaneous firing of MKD/B2

4

5 Spontaneous firing of D/B2 on 16/11 02:13:06

6

7 Spontaneous firing (?) of B/B2 on16/11 20:41:10

8 Spontaneous firing of B/B2 on16/11 20:41:10

9 Spontaneous (?) firing B/B2 during switching off D/B2 18/11

10 Erratic of B/B2 during switching off D/B2

11 Non typical self-firing (?) of G/B2

12 Searching reasons of spontaneous firing Abnormally dry air observed in UA67 during tests (dew point - 9 deg) To find if it affects B1 – it was put in DC mode between 30/11-03/12: ~24h rising from 6 to 7 Tev; 36 h at 7 TeV and finally 24 h at 7.1 TeV; no self- firing observed

13 Searching reasons of spontaneous firing Hypothesis of charging of plexiglass insulation rods by friction of dry air blown by ventilators towards GTO stacks: switched off ventilators in Gen D, E, F, G, H, I, J – during 7 days – not confirmed Observation of noisy output of several PTU – even PTU signal before GTO current – on Gen. D:

14 Continuation tests Generators B and J in laboratory for tests DC test during Christmass DC and ramp test in 2014 Surveillance of PTU activity/retrigger propagation (thresholding)