Presentation is loading. Please wait.

Presentation is loading. Please wait.

Review of Activities 1 st Quarter 2015 Industrial services division ACCIMT 1.

Similar presentations


Presentation on theme: "Review of Activities 1 st Quarter 2015 Industrial services division ACCIMT 1."— Presentation transcript:

1 Review of Activities 1 st Quarter 2015 Industrial services division ACCIMT 1

2 Instrument Calibration and Performance Tests Services offered by the Calibration Laboratory of Industrial Services Division 2

3 3 InstrumentQtyClient Contact Voltage drop tester 1Lanka Harness Co (Pvt) Ltd No of Calibration - 1 Amount – 10,000/= Calibration / Performance Test in January Fluke 5520A received after recalibration (USA ) at end of January

4 4 InstrumentQtyClient Digital Clamp Meter1SGS Lanka (Pvt) Ltd With standing Voltage tester2FDK Lanka (Pvt) Ltd Power Analyzer 1Electro Metal Pressings (Pvt) Ltd No of Calibration - 4 Amount - =37,984.80 /= Calibration / Performance Test in February

5 5 InstrumentQtyClient True RMS Multimeter01 Colombo Dockyard PLC Analogue Multimeter01 CR Oscillator01 Digital Multimeter01 Automative Meter01 Oscilloscope01 Power Supply01 Insulation Continuity tester01 High Voltage Insulation tester01Colombo Dockyard PLC Insulation Continuity tester01 David Pieris Motor Company Ltd Digital Multimeter01 RCCB Digital Tester01David pieris Motor Company Ltd Calibration / Performance Test in March

6 6 Calibration / Performance Test in March - 2 InstrumentQtyClient Digital Multimeter03 ACCIMT Digital Real time Oscilloscope 01 Standerd Resisters01 Clamp Meter01 No of Calibration = 18 Amount = 65,667.60

7 7 MonthNo of JobsAmount January0110,000 February0437,984.80 March1865,667.60 Total23113,652.40

8 8 CPD Training Programmable Logic Controller Course (CPD Type) PLC Course No of Participants No of days DurationClient 2015 1 sr ( Friday/ Saturday) 2207 23 rd, 24 th,30 th, 31 st, January & 06 th,07 th, 13 th February MAS Fabrick (Pvt) Ltd, MAS Active (private) Limited, Silver mill Natural Beverage Pvt Ltd Private Amount = 308, 000 Planning and Coordination work for PLC 2015 2 nd Course

9 Advanced Light Measurement Laboratory Part of Light Measurement system was delivered by Rotax Ltd. Initiated to upgrade lab premises with partition and carpets. 9

10 10 No of Participa nts (Forms) No of Questi ons (Q) F x Q Grades No of Points (P) Marks (M) P x M 6424Excellent Very Good Good Fair Poor 9 4 10 1 0 100 90 70 50 00 900 360 700 50 0 Total P x M =2010 Client satisfaction = Total (P x M) /F x Q =83.75 Calibration Feed Back -1Q

11 CPD –PLC Course Feed Back -1Q PLC 1 st Course No of Participants (C) Grades No of Points % (P) Marks (M) P x M 21 (Forms) Excellent Very Good Good Fair Poor 6960069600 100 90 70 50 00 600 810 420 0 Total =1830 Client satisfaction = Total P x M /C =87.14 11


Download ppt "Review of Activities 1 st Quarter 2015 Industrial services division ACCIMT 1."

Similar presentations


Ads by Google