Wisconsin DOT EDC Initiatives Rory Rhinesmith, P.E. Deputy Administrator – DTSD Bureaus
2
Wisconsin EDC Round 1 Shortening Project Delivery Accelerating Technology and Innovation Deployment
3
Wisconsin EDC Round 1 Shortening Project Delivery Planning and Environmental Linkages Legal Sufficiency Enhancements Expanding Use of Programmatic Agreements Clarifying the Scope of Preliminary Design Flexibilities in Utility Accommodation and Relocation
4
Wisconsin EDC Round 1 Accelerating Technology and Innovation Deployment Warm Mix Asphalt Safety Edge Geo-synthetic Reinforced Structures Prefabricated Bridge Elements & Systems Adaptive Traffic Control Systems
5
Wisconsin EDC Round 2 Fall Summits Spring Virtual Summits Reducing Project Delivery Time Programmatic Agreements Locally Administered Projects Reducing Construction Time 3D Modeling for Construction Means and Methods Accelerated Bridge Construction Intelligent Compaction Innovative Contracting Design-Build CM/GC Alternative Technical Concepts Reducing Project Delivery Time Geospatial Data Collaboration Safety High Friction Surfaces Environment Level of NEPA Documentation Mobility First Responders Training