Why am I here? “Real World” example Some notes from industry
4
So what’s the story? HyCO = Hydrogen + Carbon Monoxide How does the HyCO work? (Go to PFD)Go to PFD Amine System (Go to Amine)Go to Amine
5
HyCO Process Flow Dryers PSA Cold Box Cold Box Membranes Reformer (Reactions) CO Hydrogen Natural Gas + Steam Amine System Amine System (Details)
6
~60’ Reformer Reactions Natural Gas Reforming: –CH 4 + H 2 O ↔ 3H 2 + CO Water Shift Reaction –CO + H 2 O ↔ H 2 + CO 2 Back to PFD
7
Amine System Absorber Stripper Reboiler Heat Exchanger Process Gas Inlet Process Gas Outlet CO 2 (Inside) Amine System Amine System
8
Pictures Inside Stripper X Reboiler Top Wall Re- boiler
9
Downcomer Tray Pictures Inside Stripper X Missing Clips Re- boiler
10
Pictures Inside Stripper X Steam Deflector Plate Re- boiler
11
So What Next?
12
Form the Team Research & Development Engineering & Design Process Control Experts Plant Operations HyCO Personnel
13
What’s our Goal? Reduce corrosion in the stripper… While maintaining absorber’s CO 2 removal
14
But Why? If we have to replace stripper packing… –$50,000 for packing –Plant shutdown = lost product revenue –Packing degradation ruined 2 pumps ($$$)
15
What’s Important?... Constraint Variables Manipulated Variables Disturbance Variables
16
Which Allows Us To… MVPC Controller MVPC Controller CV Target CV Value MV History DV History MV Setpoint
17
Amine System Revisited Absorber Stripper Reboiler Heat Exchanger Process Gas Inlet Process Gas Outlet CO 2 CV MV DV
18
Stripper ReboilerAmine RecircTotal CO 2 Flow Stripper Ovhd Temp??? CO 2 Slip??? Rich Liquid Loading??? Stripper Top DP??? Stripper Bottom DP??? Absorber DP??? How do these guys interact? MVs CVs
19
Next came the tough part Test & collect process reaction curves Import to Excel & Matlab Fit First Order plus Time Delay models
20
Example Step Response G = 0.5 τ = 4.5 θ = 3.0 (7.5)(3.0) (0.5) θ τ
21
Stripper ReboilerAmine RecircTotal CO 2 Flow Stripper Ovhd Temp CO 2 SlipModeled Rich Liquid Loading Stripper Top DP Stripper Bottom DP Absorber DP Modeled Now we Know MVs CVs
22
Inserting Models into MVPC…
23
Overall Results Post Implementation T avg = 225 ± 10°F T avg = 220 ± 4°F 5°FReduced average temperature by 5°F (225°F to 220°F) 60%Decreased standard deviation by 60% (10°F to 4°F) Corrision Temperature
24
Miscellaneous Project Updates Tools used Tasks performed
25
Conclusions Important Factors: –ENTIRE team –We reduced the risk of corrosion! –Project’s success is leading to further MVPC around the plant’s reformer
26
Thanks! Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.