King Fahd University of Petroleum and Minerals College of Environmental Design Department of Construction Engineering and Management CEM:520: CONSTRUCTION CONTRACTING Term Paper Presentation FACTORS AFFECTING CONTRACTOR PERFORMANCE Presented to:Presented by: Mohmead Fouad I.D. # 220432 Date: Dec. 2003 Dr. Saad Assaf
4
Outline Objective of the study Study Limitations Research Methodology Survey Questionnaire Results and Analysis Study Conclusion Recommendations
5
Objective of the study To explore the performance of the building construction contractors Find out factors affecting their performance Check the importance of each factor To provide suggested solutions to high performance and quality
6
Study Limitations Building Construction Contractors only Location of business in Jubail Industrial City Chose 36 contractor executed between 1982 to 1988 by a Saudi or joint venture firm
7
Research Methodology Literature Review Development of initial questionnaire Collecting Data from contractor performance evaluation reports Development of final questionnaire Questionnaire Survey plus interviews Data Collection Data analysis Conclusion and Recommendations
8
Survey Questionnaire Statistical Sample: 32 respondents from contractors “Analysis Statically using the SAS mainframe computer package
9
Results and Analysis Factors Affecting Performance Samples: General Requirements Site Work Materials Specifications Construction Divisions (Elec., Mech., ect.) Results analyzed using different methodology techniques
10
Study Conclusion Big size contractor have higher performance than the small one Design and construct type of contract have higher contract performance than construct type only Contracts with change order tend to have a higher contractor performance Higher monetary value contract have higher contractor performance
11
Study Recommendation Contractors Classifications have to be study before awarding contract Contracts should be clear and straight More supervision have to be made Design and construct contracts are recommended for building construction contracts
12
Thanks… The End