Download presentation
Presentation is loading. Please wait.
Published byBarbra Gilbert Modified over 9 years ago
1
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012
2
Telecom 2 9/17/2012 SPP/FIELDS Monthly Report Review Schedule Review Financial Report Review EVM Inputs and Variance Explanations MONTHLY MGMT AGENDA
3
Telecom 3 9/17/2012 SPP/FIELDS FIELDS Overview Observations Measure electric and magnetic fields and waves Measure poynting flux, absolute plasma density and electron temperature, S/C floating potential and density fluctuations, and radio emissions Measurements Magnetic field vectorsDC-50kHz Electric field vectorsDC-1MHz Plasma waves5Hz to 1MHz Quasi-thermal Noise10 kHz to 2.5MHz Radio emissions1MHz to 16MHz 3 Milestones (Phase B) FIELDS Specification Dev (L2)Oct, 2012 MEP Specification Dev (L3)Jan, 2013 ICU & AEB Detailed DsnSep 2013 HFR/TNR Detailed DsnOct 2013 FPGA ReviewsOct 2013 IPDRNov 2013 Project Status Update Phase B contract signed 7/24/12 Funding Definitized Contract Value: $13.7 M Definitized Funding Value:$ 3.6 M End Date:3/14/2013 Current EAC:$13.7 M UCB E-Field Antenna LPC2E Search-Coil Magnetometer (SCM) GSFC Fluxgate Magnetometer (MAG)
4
Telecom 4 9/17/2012 SPP/FIELDS FIELDS Overview 4 E-Field Antennas 2.3 m Tip-to-Hinge Preamps located at Hinge Mag Boom MAG (Inboard) MAG (Outboard) SCM Main Electronics Package (MEP) Main Electronics Package includes: Thermal Noise Receiver / High Frequency Receiver (TNR/HFR) - LESIA Time Domain Sampler (TDS) - UMinn Digital Fields Board (DFB) - LASP Antenna Electronics Board (AEB) – UCB MAG Electronics (MAG) – GSFC Instrument Control Unit (ICU) – UCB Low Noise Power Supply (LNPS) - UMinn
5
Telecom 5 9/17/2012 SPP/FIELDS FIELDs Organization 5
6
Telecom 6 9/17/2012 SPP/FIELDS FIELDs Technical Status Antenna Technology Development Basic Concept Complete Materials Tests in progress @GRC Niobium C-103 Tantalum-Tungsten Ta-W Thermal Modeling Expected 10/15/12 Will need Preamp details soon Thermal Test Model Design in progress Fabrication expect by end of year PROMES tests in Winter 2013 Deployment Brake Prototype #1 Complete Prototype #2 in fab 6
7
Telecom 7 9/17/2012 SPP/FIELDS Main Electronics Package Development Basic Interface Concept with Spacecraft Complete Internal Electrical Concept Complete Working on Box Mechanical Specifications Basic Concept Uses Board Slices (similar to MAVEN) Board Size Must be Common Among all Boards FIELDS boards have THEMIS, MAVEN and STEREO heritage Mass Estimate Used THEMIS-sized Boards (6”x9”) AEB (THEMIS) no issue ICU (MAVEN) adding memory but will fit in 6x9” format. DFB (THEMIS) has to add circuitry and needs smaller A/D’s to fit. The smaller A/Ds need radiation testing (in the works at LASP). MAG (MAVEN) is requesting a separate slice for heater circuits and more filtering than on MAVEN. Would prefer MAVEN footprint. Digital Spectrometer would be a single slice, replacing HFR-TNR. There is a group working on these specifications. FIELDS Technical Status
8
Telecom 8 9/17/2012 SPP/FIELDS Electric Field Antennae Schedule Materials Materials testing at GRC has shown mass increases in the samples Concern that oxidation will change optical properties, we have repeated tests with “O2 getters” These did not solve the problem. Added a second candidate material Ta-W to test Thermal Test Model (at PROMES) Thermal modeling showed initial concept of TTM would not fully demonstrate the design. Revised TMM design in progress, fabrication by year end. Next PROMES opportunity is Winter 2013 (not Sept 2012) FIELDS Schedule
9
Telecom 9 9/17/2012 SPP/FIELDS Main Electronics Package Schedule Very high-level schedule of MEP effort currently in master schedule Details to be linked in as the detailed specification is finished (i.e. Will the board size, shape, connectors change, etc?) ICU design will have priority as other board designers will need “ICU simulators” for their test apparatus. ICU test will require S/C simulator (GSEOS) as in RBSP. FIELDs ICD will be needed for S/C simulator. (LNPS, TDS, and DFB have nearly the same schedules at this point.) FIELDS Schedule
10
Telecom 10 9/17/2012 SPP/FIELDS MAG Schedule Supported MAG-SCM tests Final report just delivered last week GSFC has demonstrated 256 samples/sec operation Designed non-magnetic TV chamber for sensor life tests Considering materials changes in sensor FIELDS Schedule
11
Telecom 11 9/17/2012 SPP/FIELDS SCM Schedule Supported MAG- SCM compatibility tests Built / Tested dual gain model with acceptable results for SPP Developed SCM specification FIELDS Schedule
12
Telecom 12 9/17/2012 SPP/FIELDS FIELDS Risk Summary 1)F14 - Phase B Schedule Risk has been retired. This risk turned into reality as the APL-to-UCB contract took until the end of the funded period and UCB watched all its subcontracts fall out of contract. According to our Sponsored Projects Office, No-Cost-Extensions were offered to all subcontractors. We expect to get back on schedule in the coming period. 2)F3 - Foreign Funding (commitment): Continuing as our top risk, we are expecting to hear more next month from our French colleagues about possible technical working arrangements for a joint project.
13
Telecom 13 9/17/2012 SPP/FIELDS FIELDS Cost
14
Telecom 14 9/17/2012 SPP/FIELDS Subcontracts All Subcontracts are currently on No-Cost Extensions APL-UCB contract modifications have historically occurred too late for UCB to keep subcontractors continuously funded.
15
Telecom 15 9/17/2012 SPP/FIELDS Technical HFR/TNR funding issues. Replacement with UCB-Digital Receiver Continuing EMC program (needed for final specification) Vector Electric Field Fidelity (with S/C Electrostatics) Cost No Issues Schedule Fall 2012 Manpower issues. RBSP launch, CINEMA launch, FOXSI launch and MAVEN delivery has depleted engineering and management resources. FIELDS Issues & Concerns
Similar presentations
© 2024 SlidePlayer.com. Inc.