August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also on: http://nicewww.cern.ch/atlas/wwwslides/SWplanAA/index.htm
2
August 98 2 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Offline Software Plan
3
August 98 3 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Definition of milestones Ingredients: Milestones given in CTP OO reconstruction and simulation - first version available end 99 Full chain operational on subset of final infrastructure - 1 year before LHC start-up Coverage of interim needs –Physics studies –Test beam support –Radiation level studies
4
August 98 4 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Milestones - 1 General Test full chain in real environment7/04 Decide on first production OS7/03 Revisit development environment7/00 Install test and verification procedure4/99 Assess development resources4/99 Analysis Analysis requirements collected11/98 Evaluate analysis environment for interim period3/99 Evaluate analysis environment for production period7/02 Implement analysis environment for production period7/02
5
August 98 5 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Milestones - 2 Event storage Define raw data structure12/98 GEANT3 events in ObjDB8/98 GEANT4 events in ObjDB7/99 Provide DB performance report7/00 Decide on database vendor6/01 Define initial version of ESD7/99 Define initial version of event tag7/99 Define initial version of AOD7/99
6
August 98 6 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Milestones - 3 Simulation ATLAS simulation domains defined9/98 GEANT4 test beam simulations3/99 Terminate maintenance DICE3/01 First general OO simulation available12/99 Define event generator interface1/99 Simulation framework available1/99 Single particles from G4 in ARVE1/99 Simulation geometry available7/99 Minimum bias overlay5/00
7
August 98 7 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Milestones - 4 Reconstruction version 1 First complete OO reconstruction12/99 Reconstruction geometry available3/99 Prepare data12/98 Find tracks2/99 Find ID tracks2/99 Find muon tracks4/99 Find global tracks7/99 Find cal clusters5/99 Calorimeter Calibration4/99 Muon Spectrometer alignment7/98 Inner Detector Alignment7/99 Event display prototype7/99
8
August 98 8 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Milestones - 5 Infrastructure Conclude study on regional centres11/99 Define financing of computing at CERN10/99 Define scope of regional centres11/99 1 Tbyte database prototype12/98 100 Tbyte database prototype12/03 Full database available12/04 1% processing farm prototype12/02 5% processing farm12/03 40% processing farm12/04 100% processing farm6/05
9
August 98 9 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Next Add missing topics Provide more detailed description Identify people responsible for each milestone Agree on the dates for the milestones For the milestones due in the next 10 months: –Define intermediate milestones –Assess resources needed/available –Define regular monitoring mechanism