1 Asphalt Paving Athletic Surfaces Mike Vinton, CTCB
2
2 Contractors Breakdown in communicationBreakdown in communication Paver PridePaver Pride Too much prep work before surfacingToo much prep work before surfacing – time consuming – expensive
3
3
4
4
5
5
6
6 Today we are going to touch on some basic ideas for steps that we can take to prepare us for hiring and managing a skilled paving contractor.
7
7 HIRE A COMPETENT CONTRACTOR Interview Process Investigate the company
8
8 JOB SITE MEETINGS WITH PAVER ► Visit Site ► Ask Questions
9
9 JOB PLAN & JOB GOALS Manpower Manpower Equipment Equipment Asphalt Plant Asphalt Plant Trucking Requirements Trucking Requirements
10
10 SUB-GRADE SUB-GRADE Proper aggregate placement / prep SUB-BASE SUB-BASE Issues with wet stone base GRADING GRADING Compaction
11
11
12
12
13
13
14
14 ASPHALT PAVING Asphalt Materials Paving Machine / Screed set-up Laser / Sonics Asphalt joints Low areas
15
15
16
16
17
17
18
18
19
19 ASPHALT ROLLING This can make / break a job Initial rolling / final rolling Asphalt temperatures Roller marks
20
20
21
21
22
22
23
23 QUESTIONS Questions from your projects?
24
24 Take the time to prepare our companies and our sub-contractors. There should be no surprises. My advice is not to assume that “anyone can do this”.