Download presentation
Presentation is loading. Please wait.
Published byTodd Floyd Modified over 9 years ago
1
ECE Alignment status for 2w SIAM JAMA MEETING 31-OCTOBER 2014
2
Principles of alignment SIAM has following preference for aligning the Indian regulation with: 1.GTR 2.ECE Regulation 3.EU directive (if GTR or ECE R do not exist for that subject) 4.Any other foreign national regulation if none of the above exist. While aligning with GTR: – Where options are permitted in GTR. The option best suited for India is adopted: E.g. In GTR 3 for brakes. PBC measurement as per ASTM. Approval and marking schemes as per Indian practice.
3
Principles of alignment with ECE R The basic characteristics and performance values are taken with out change. E.g. – Photometric values for light and light signalling devices – Stopping distances for brakes. But every feature is studied w.r.to 1.Is the feature essential for Indian conditions: – If yes, included as mandatory. 2.Are the benefits of feature doubtful in Indian conditions? – If yes, included as optional. E.g. AHO (at the time when AIS 009 was revised)
4
Principles of alignment with ECE R 3.Will the ECE feature pose a safety hazard in Indian condition? If yes, exclude them. E.g – Headlamps with passing beam pattern for both kinds of traffic with necessary adjustment to be done by the driver depending on which traffic pattern he is in. – Allowing headlamps with main beam and passing beam to be approved only for passing beam. 4. Is the non ECE features in current regulation really needed? If no, exclude them from the standard E.g. many of the environmental and durability tests for light and light signalling devices.
5
Transitional Provisions Transitional provision principles (AIS 00) permit: – Use of the revised standard, after it is approved by CMVR TSC, in lieu of the old version. – Changes in ECE issued as supplements (i.e. as per ECE old type approvals continue to be valid) are allowed to be used with permission of Chairman AISC. – However, changes in ECE issued as “series of amendments” (i.e. as per ECE re-type approval is needed) are not permitted.
6
Benefits These principles and transitional provisions permit Use of parts complying with ECE regulations to be used, subject to: – ECE Regulation Series of amendments up to the AIS/BIS level. – Additional Indian Approval process remains. – Not Applicable when an “ISI” marking has become mandatory.
7
Current status The ECE regulations and current status are tabulated in subsequent slides. Some of the standards are approved by CMVR TSC, but not yet notified. – But are permitted to be used because of transitional provisions. There have been changes in ECE R, in many of such cases, but SIAM prefers not to propose any changes to these AIS/BIS till these standards are notified.
8
AIS/BIS implemented/notified (1/4) No need felt by SIAM to take up these standards for any Revision ECE RSubjectAIS/BIS 10-02EMCAIS 004 PART 3 39-00SpeedometerIS-11827-2008 75 Rev 1TyresIS 15627 : 2005 78-02BrakingIS: 14664: 1999
9
ECE RSubjectAIS/BIS 03-02Retro ReflectorAIS 057 REV 1 19-03Front Fog lamp (optional)AIS 012 PART 1 REV 1 R28Horn Installation (Optional)IS 15796:2008 37-03Filament lampsAIS 034 PART 1 38-0Rear fog lampAIS 012 PART 2 46-02 Rear view mirror (2W with body) Device AIS 001 Pt.2 Installation AIS 002 Pt 2 50-00Signalling lampsAIS 010 Part 3, Rev 1 53-01Installation of lightsAIS 009 Rev 1 GTR 12 (R60) Tell tale symbols and controls (Aligned with GTR 12) AIS 126 GTR 3 (78-03) Braking (Aligned with GTR 3) IS: 14664: 2010 AIS/BIS implemented/notified (2/4)
10
Changes to amend for further alignment will be proposed by SIAM only after these standards are notified. SIAM has no idea when these will be notified ECE RSubjectAIS/BIS 81-00Rear view mirror (2W w/o body) Device AIS 001 Pt.2 Installation AIS 002 Pt 2 87-00DRLAIS 012 Part 10 98-00 Headlamps with gas discharge light sources AIS 010 PART 4 REV 1 99-00Gas-discharge light sourcesAIS O34 PART 2 REV 1 112-00Asymmetric headlampsAIS 010 PART 1 REV 1 113-00Symmetric headlampsAIS 010 PART1 REV 1 GTR 12Tell tale symbols and controlsAIS 126 AIS/BIS implemented/notified (3/4)
11
Even though the lead times were agreed in the CMVR TSC, may get changed at the time of notification. In the case of IS14664, availability of test track is also a constraint. SIAM expects to firm up the proper definition for new model shortly. Lead time starting from 1 st April or 1 st October, which ever occurs from date of notification AISNew modelExisting model 009 010 Pt 1 010 pt 2 010 pt 3 24 months48 months IS: 14664: 2010 18 months 42 months AIS 12624 months36 months ALL OTHERS18 months 24 months AIS/BIS implemented/notified (4/4)
12
AIS/BIS taken up for revision for further alignment ECE RSubjectAIS/BISStatus 41-04Noise New IS in place of IS 3028 BIS committee Finalized. 75 Rev 1TyresIS 15627BIS has agreed to take up 28HornIS I884 BIS committee working on this. 128-00LEDNEWAISC working on this NO ROAD MAP AVAILABLE FOR COMPLETION OF ACTIVITIES
13
DISCUSSIONS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.