Download presentation
Presentation is loading. Please wait.
Published byNickolas Cook Modified over 9 years ago
1
Loran Integrity Performance Panel Integrity Fault Tree for Loran Sherman Lo Second LORIPP Meeting Portland, OR September 23-24, 2002
2
Loran Integrity Performance Panel Outline Integrity Fault Tree Loran Threat List Transmitter Propagation Receiver Error Allocations Fault Document Conclusions
3
Loran Integrity Performance Panel Goals Discuss Listing of Faults Agree on Form of Top Level Integrity Fault Tree Use Fault Tree for Analysis & Documents Make Documents Available to LORIPP Members
4
Loran Integrity Performance Panel Fault Tree Design Logical Means of Allocating Fault Probabilities Design to Specific Analysis (i.e. threat monitors, error bounds) In Loran Navigation, Design Towards HPL Error Components Bookkeeping to Verify Not Exceeding Maximum Level of HMI Comprehensively Exhaustive Mutually Exclusive (Desired)
5
Loran Integrity Performance Panel Integrity Fault Tree Phase Error Cycle Error
6
Loran Integrity Performance Panel HPL Equation is the factor on standard deviations of the overbounding gaussian needed to achieve the desired confidence level. I.e. =5.33 results in a probability of an error exceeding that value of 0.98x10 -7. K i are the weighting factors derived from the pseudoinverse of the geometry matrix i is the standard deviation of the normal distribution that overbounds the randomly distributed errors i an overbound for the correlated bias terms i an overbound for the uncorrelated bias terms
7
Loran Integrity Performance Panel Example Fault Tree
8
Loran Integrity Performance Panel Loran Threats (Transmitter) Integrity Faults Timing Jump Timing Drift Pulse Shape Distortion Tube Type Transmitter (TTX) Frequency & Timing Equipment Cesium Freq. Standard, Timer, Frequency Patch Panel, Frequency Distribution Amp, Timer Set Control Pulse Generation & Transmission Pulse Generator, Transmitter, Antenna, Transmitter Interface Unit, Antenna Coupler Other Equipment Used for collecting, recording, and reporting
9
Loran Integrity Performance Panel Loran Threats (Transmitter) Solid State Transmitter (SSX) Pulse Amplitude & Timing Controller (PATCO) Display ECD, Timing Logic, Loop Control, Microprocessor Boards, Power Supplies, Switches Signal Distribution Amplifier (SDA) Distribution Boards Half Cycle Generators (HCG) Control Logic Boards, FD&C Board, AC & C1 Regulator Boards, Power Supplies, Megatron, Megatron Charge Assembly Coupling Network (CN) Coupling Equipment Transmit Hardware Transmitter Bus Work, Antenna Coupler, Ground Plane
10
Loran Integrity Performance Panel Loran Threats (Propagation Prediction Errors) Additional Secondary Factor Prediction Errors ECD Prediction Error Signal Strength Prediction (Terrain Effects)
11
Loran Integrity Performance Panel Loran Threats (Receiver Interference) Atmospheric Effects Atmospheric Noise P Static (is this availability?) Lightning (Near Field) Interference (Man Made) Sky Wave Interference Cross Rate Interference CW Interference Locally Generated Platform Noise
12
Loran Integrity Performance Panel Loran Threats (Receiver) Hardware Receiver Antenna Bias Thermal Noise Bandpass Filter Locally Generated Platform Noise Software Cycle Tracking Doppler Tracking Signal Tracking
13
Loran Integrity Performance Panel Example Breakdown - SSX
14
Loran Integrity Performance Panel Allocation
15
Loran Integrity Performance Panel Documentation For each threat: Description Algorithm Description Integrity Algorithm Verification Validation of Algorithm Assumed Conditions Dependencies Correspond to Fault Tree
16
Loran Integrity Performance Panel Conclusions The Integrity Fault Tree Exists to Facilitate Proof that We Meet Integrity Requirements Designed to Correspond to Requirements for HPL Calculation (Errors & Bounds) Should Aid in Documentation
17
Loran Integrity Performance Panel Loran Threats (Propagation) Additional Secondary Factor Prediction Errors Atmospheric Noise P Static Sky Wave Interference Cross Rate Interference
18
Loran Integrity Performance Panel Loran Threats (Propagation) Atmospheric Effects Additional Secondary Factor Prediction Errors Atmospheric Noise P Static (is this availability?) Lightning (Near Field) Interference (Man Made) Sky Wave Interference Cross Rate Interference CW Interference
19
Loran Integrity Performance Panel Loran Threats (Receiver) Hardware Receiver Antenna Bias Thermal Noise Bandpass Filter Software Cycle Tracking Doppler Tracking Signal Tracking
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.