Download presentation
Presentation is loading. Please wait.
Published byAntonia Lyons Modified over 9 years ago
1
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE Danish Army Command and Control Information System Workshop on Data Replication over Disadvantaget Tactical Communication Link's 11 – 12 September 2002 UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE
2
2 19 August 2015 THE SPEAKER Erling J. Rasmussen major Operational Project Officer Danish Army Command and Control Information System & ACOS/CCIS-Section/Danish Division E-mail: daccis-ddiv@mail.sonofon.dk
3
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 3 19 August 2015 AGENDA Introduction Requirements Problems Solution's DACCIS Demonstration
4
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE INTRODUCTION
5
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 5 19 August 2015 "Giving bad commanders more information does not make them good. They just make bad decisions faster, or get so overwhelmed that they can't make any decision"
6
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 6 19 August 2015 PURPOSE To reduce time consumption To improve the basis for decisions. To improve exchange of information. To improve handling of information. To modernise the presentation of information To improve and extend the use of computer assisted exercises (CAX).
7
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE PROBLEMS
8
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 8 19 August 2015
9
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 9 19 August 2015 COMMUNICATIONS
10
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 10 19 August 2015 CONNECTIONS VHF HF TN 4 Kb/sec – 1 Mb/sec
11
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 11 19 August 2015 ASSOCIATE MEMBERS AS JCCS, BCSS AUROSE BESICBEL CZGF-TCCS PL KOLORADO POSICCE TUTKKBS HU INTEROPERABILITY FULL MEMBERS CA LFCS DADACCIS FRSICF, SIR GEHEROS-2/1 ITSIACCON NONACCIS/NORCCIS NLISIS SPSIMACET UKATacCS/ComBAT USMCS
12
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 12 19 August 2015 INFORMATION EXCHANGE (Replication) XX X II Div Bn Bde
13
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 13 19 August 2015 CHANCE HEADQUARTERS LOCATION
14
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 14 19 August 2015 UPDATES
15
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 15 19 August 2015 NEW UNITS
16
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 16 19 August 2015 COMMON OPERATIONAL PICTURE WHO IS DECIDING WHICH INFORMATION THE COMMON OPERATIONAL PICTURE INCLUDES ? - ONLY THE COMMANDERS INVOLVED!
17
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 17 19 August 2015 REPORTS
18
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 18 19 August 2015 MIP MTF ORGLOCAT
19
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 19 19 August 2015 WHAT TO HANDLE? (EXAMPLES) Division and sub units: 116.000 full filled pieces of A4 papers/24 Hour 50 – 75 Informations/Hour 100 – 125 Informations/Hour 150 – 175 Informations/Hour x xx G2: (Good old Warsaw Pact scenario)
20
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE SOLUTIONS
21
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 21 19 August 2015 MI P M ULTILATERAL I NTEROPERABILITY P ROGRAM 19 200220032004 Results to NATO ……
22
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 22 19 August 2015 DYNAMIC CONTRACTING 1 - Manoeuvre - Intelligence - Fire Support - Logistic - Mobility/ Counter mobility - Survivability /Protection - Air Defense - Command and Control - CIMIC AOI Time Orbat Hostility AOI Time Orbat Hostility Functional Areas Main Template Filters Situation Planning Reference data Main Category STEP 1STEP 3STEP 2
23
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 23 19 August 2015 DYNAMIC CONTRACTING 2 - Manoeuvre - Intelligence - Fire Support - Logistic - Mobility/ Counter mobility - Survivability /Protection - Air Defense - Command and Control - CIMIC AOI Time Orbat Hostility AOI Time Orbat Hostility Functional Areas Main Template Filters STEP 3 Logistic G1 Logistic G4 Reports Assessments Intelligence Collection Plan Functional Areas Sub Template STEP 2 Situation Planning Reference data Main Catagory STEP 1
24
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 24 19 August 2015 Danish Army Command and Control Command and Control Information System Information System
25
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 25 19 August 2015 DACCIS DEVELOPMENT I = Danish Division and its sub units and The Danish Reaction Brigade II = Brigade sub units III = Other units in the Danish Army IV = Corps ? V = NORCAPS? 5 PROJECT´S
26
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 26 19 August 2015 Automatic, near real time information exchange on Article 5 and Crisis Response Operations. Using LC2EIDM, ARM and DYNAMIC CONTRACTING gives the possibility to exchange exactly the necessary information that Commanders need and at the same time save bandwidth. Covering planning and execution in all functional areas. Danish Army Command and Control Information System l l xx x Designed for xxx
27
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 27 19 August 2015 DANISH DIVISION TOC 1 TOC 2 PLANC FHQ SYSOFF SYSSGT SYSADM GIS-SGT SYSOFF SYSSGT SYSADM CH/CCIS SYSADM GIS-SGT
28
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 28 19 August 2015 OPERATIONAL REQUIREMENTS SPECIFICATIONS USE CASES DEVELOPMENT FAT/FIAT & USER-TESTS EDUCATION OPERATIONAL DEVELOPMENT PROCESS (Rational Unified Process) WS 4 WS 3 WS 2 WS 1 Price – Time - Connections
29
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 29 19 August 2015 TRAINING INPUTOUTPUT TRAINING SYSTEM INPUTOUTPUT PRE- REQUISITE TRAINING DACCIS PREREQUISITE MS Office MS Office 2-3 days Must do the rest!
30
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 30 19 August 2015 HARDWARE
31
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 31 19 August 2015 MATERIEL
32
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 32 19 August 2015 MATERIEL
33
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 33 19 August 2015 MATERIEL
34
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 34 19 August 2015 END STATE 1000? + 200 Servers?
35
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 35 19 August 2015 WHAT´S NEW!
36
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 36 19 August 2015 PHASE 2 FUNCTIONALITIES (1) Own COA/Enemy COA- confrontation. Relative Combat Power. Actual Target acqui. List. Intel Collection Plan. Counter Intel Incidents. UAV-request etc. FLET. Time/Distance for Meeting Engagement. G2/G3 Terrain Analysis. Informations on Bridges and passability. Engineer Plan. ENGR Situation Overlay. NBC Overlay. ENGR Means: –Status. –Allocation. G3, Engineer
37
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 37 19 August 2015 PHASE 2 FUNCTIONALITIES (2) Logistic Planning. Logistic Situation overlay. Logistic ”Stop Lights”. Calculation of need for Logistic Support. Movement Planning. CIMIC overlay etc. G1/G4 Air Defence Situation Overlay. Air Defence. Air Defence Sketch. HEL Situation Overlay G3, Air Defence HEL Situation Overlay. Best low level fliht route G3, Hel
38
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 38 19 August 2015 PHASE 2 FUNCTIONALITIES (3) G6Other functions DACCIS on the Defence Integrated information Network. Supporting app. 50 Reports. System Management. GIS management. Allocation of Frq. Outline of location of Units. Code Words etc. Annex S (COMMS) to the OPORDER. COMMS Situation Overlay.
39
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 39 19 August 2015 PHASE 2 FUNCTIONALITIES (4) - and another 75 functionality's
40
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 40 19 August 2015 3 D
41
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE 41 19 August 2015
42
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE Danish Army Command and Control Information System QUESTIONS - SO FAR?
43
UNCLASSIFIED – APPROVED FOR PUBLIC RELEASE Danish Army Command and Control Information System Then to the demonstration!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.