ACQUATICS FACILITY STUDY City of Vincennes Department of Parks & Recreation
2
Overall image is poor, facility is tired and no longer an attraction. The facility lacks vitality. Visitors are being lost to other venues. The condition of the bathhouse is substandard. Without shade, the oversized concrete pool deck is oppressive in the summer heat. Pool mechanical system is antiquated and is past its life expectancy. The concrete deck all around the pools has an irregular surface at expansion joints and settlement cracks. Water from both the competition and wading pools is circulated through a single circulation pump violating current swimming pool codes. Maintaining chemical balance for this pool is difficult. It is reported that the pool loses approximately 1”-2” of water overnight due to leaks in the pool system located under the concrete pool shell. City of Vincennes – Aquatic Facility Study Concerns and Problems with Rainbow Beach
3
1. Slides and / or Diving Boards 2. Play Apparatus / Structure for all ages 3. Zero Depth Entry 4. Competition / Recreation Combination – Uniqueness of 50 Meter Pool 5. Upgraded Bathhouse 6. Improved Concessions 7. ADA Accessibility 8. Variety of Experiences – Water Basketball, Water Volleyball, Etc. 9. Shade Structures and Lounge Seating 10. Sound System and Wi-Fi 11. Planned Activities and Programs City of Vincennes – Aquatic Facility Study Recommendations
4
City of Vincennes – Aquatic Facility Study Pool Amenities
5
Slides City of Vincennes – Aquatic Facility Study
6
Zero Depth Entry City of Vincennes – Aquatic Facility Study
7
Shade Structures City of Vincennes – Aquatic Facility Study
8
Play Apparatus City of Vincennes – Aquatic Facility Study
9
Spray Parks City of Vincennes – Aquatic Facility Study
10
Recreation/Competition Combination City of Vincennes – Aquatic Facility Study
11
Bathhouse, Locker Facilities and Party Facilities City of Vincennes – Aquatic Facility Study
12
Options for Rainbow Beach
13
Option A: Addition of a spray park to the existing facility City of Vincennes – Aquatic Facility Study
14
Description and Cost Existing Recreation Pool and Bathhouse to Remain…………………….....................…....... Remove existing Wadding Pool and Deck………………………………………………………….…. Create New Splash Park………………………..…………………………………………………………… Provide Associated Site Improvements…………………….…………………………………….….... Shade Structures, Pavement, Fencing, Etc. Contractor General Conditions/Overhead & Profit…………………………………………..……….. Construction Range of Magnitude Budget………………..…………………………….….…….. Add new deck around the existing pool…………………………………………………………….……. $$$$$$$$$$$$ 0 10,000 140,000 85,000 22,000 257,000 ????? City of Vincennes – Aquatic Facility Study Option A: Addition of a spray park to the existing facility
15
City of Vincennes – Aquatic Facility Study Option B: Renovation of the existing facility
16
Description and Cost Minor Renovations to Existing Bathhouse.……………….…......................................... Renovation Existing 10 Lane 50 Meter Lap Pool………………....…………………............. Infill Diving Well, Create New Slide Well, Create Zero Depth Entry, New Pool Filtration & Chemical Systems, Piping & Equipment Demolition, New Equipment Building, MEP, Pool Deck, Fencing & Shade Structures……………….…………….………………………………………………..…......… Provide New Water Slide…………………………………………………………………………....... New Water Features/Play Apparatus……………………….………………………………...….. Contractor General Conditions/Overhead & Profit.………………………………………..…. Construction Range of Magnitude Budget……….………………………………….........… $$$$$$$$$$$$$$ 100,000 1,800,000 810,000 175,000 165,000 305,000 3,355,000 -$300,000 -$3,480,000 City of Vincennes – Aquatic Facility Study Option B: Renovation of the existing facility
17
City of Vincennes – Aquatic Facility Study Option B.1: Renovation of the existing facility
18
Description and Cost Minor Renovations to Existing Bathhouse………………….…..................................... Renovation Existing 10 Lane 50 Meter Lap Pool………………....…………………......... Infill Diving Well, Create New Slide Well, Create Zero Depth Entry, New Pool Filtration & Chemical Systems, Piping & Equipment Demolition, New Equipment Building, MEP, Pool Deck, Fencing & Shade Structures……………………………………………………………………………………... Provide New Water Slide…………………………………………………………………………... New Water Features/Play Apparatus.……………………………………………………….... Add Spray Park and Associated Site Improvements………………………………………. Contractor General Conditions/Overhead & Profit…………………………………..…… Construction Range of Magnitude Budget………………………………………..…….… $$$$$$$$$$$$$$$$ 100,000 1,800,000 810,000 175,000 165,000 160,000 321,000 3,531,000 -$300,000 -$3,656,000 City of Vincennes – Aquatic Facility Study Option B.1: Renovation of the existing facility
19
City of Vincennes – Aquatic Facility Study Option C: Construction of a replacement facility
20
Description and Cost Minor Renovations to Existing Bathhouse…………………………….…..................... Create New Pool………………………………………………………………....……….......... Eight Lane – 25 Yard Lap Pool, Zero Depth Entry, Slide Well, New Pool Filtration & Chemical Systems, Piping & Equipment Demolition, New Equipment Building, MEP, Pool Deck, Fencing & Shade Structures, etc…………………………………………………………..………………... Provide New Water Slide………………………………………………………..................... New Water Features/Play Apparatus……………….…………………….………………... Contractor General Conditions/Overhead & Profit………………….………............ Construction Range of Magnitude Budget…………………………….................... $$$$$$$$$$$$$$ 100,000 1,250,000 740,000 175,000 165,000 243,000 2,673,000 -$300,000 -$2,798,000 City of Vincennes – Aquatic Facility Study Option C: Construction of a replacement facility
21
City of Vincennes – Aquatic Facility Study Option C.1: Construction of a replacement facility
22
Description and Cost Minor Renovations to Existing Bathhouse…………………………….…..................... Create New Pool………………………………………………………………....……………… Eight Lane – 25 Yard Lap Pool, Zero Depth Entry, Slide Well, New Pool Filtration & Chemical Systems, Piping & Equipment Demolition, New Equipment Building, MEP, Pool Deck, Fencing & Shade Structures, etc…………………………………………………………..……………….. Provide New Water Slide………………………………………………………................... New Water Features/Play Apparatus…..………………………………….……………….. Add Spray Park and Associated Site Improvements…………………………………… Contractor General Conditions/Overhead & Profit………………….………………… Construction Range of Magnitude Budget…………………………….................... $$$$$$$$$$$$$$$$ 100,000 1,250,000 740,000 175,000 165,000 160,000 259,000 2,849,000 -$300,000 -$2,974,000 City of Vincennes – Aquatic Facility Study Option C.1: Construction of a replacement facility
23
City of Vincennes – Aquatic Facility Study Option C.2: Construction of a replacement facility
24
City of Vincennes – Aquatic Facility Study Description and Cost Minor Renovations to Existing Bathhouse…………………………….…............ Create New Pool………………………………………………………………....……… Eight Lane – 50 Meter Lap Pool, Zero Depth Entry, Slide Well, New Pool Filtration & Chemical Systems, Piping & Equipment Demolition, New Equipment Building, MEP, Pool Deck, Fencing & Shade Structures, etc…………………………………………………………..……….. Provide New Water Slide………………………………………………………........... New Water Features/Play Apparatus…..………………………………….……….. Add Spray Park and Associated Site Improvements………………………….. Contractor General Conditions/Overhead & Profit………………….……….. Construction Range of Magnitude Budget…………………………….......... $$$$$$$$$$$$$$$$ 100,000 2,300,000 810,000 175,000 165,000 160,000 371,000 4,081,000 -$300,000 -$4,206,000 Option C.2: Construction of a replacement facility
25
City of Vincennes – Aquatic Facility Study Option C.3: Construction of a replacement facility
26
City of Vincennes – Aquatic Facility Study Description and Cost Create New Pool………………………………………………………………....………… Eight Lane – 50 Meter Lap Pool, Zero Depth Entry, Slide Well, New Pool Filtration & Chemical Systems, Piping & Equipment New Equipment Building, MEP, Pool Deck, Fencing & Shade Structures, etc…………………………………………………………..………….. Provide New Water Slide………………………………………………………............. New Water Features/Play Apparatus………………..……………………………….. Add Spray Park and Associated Site Improvements…………………………….. Add New Bathhouse with Concessions………………………………………………. Contractor General Conditions/Overhead & Profit………………….………….. Construction Range of Magnitude Budget……………………………............. 2,300,000 810,000 175,000 165,000 160,000 625,000 423,000 4,658,000 $$$$$$$$$$$$$$$$ -$300,000 -$4,783,000 Option C.3: Construction of a replacement facility
27
City of Vincennes – Aquatic Facility Study Cost Comparison
28
Cost Comparison of Other Facilities Year Built Pool S.F. Original Pool Cost 2012 Pool Cost Description Baker Park Pool New Castle, Indiana 20077,546$999,000$1,158,000 25 yard pool, zero depth entry, small participatory feature, slide City of Vincennes – Aquatic Facility Study
29
Cost Comparison of Other Facilities Year Built Pool S.F. Original Pool Cost 2012 Pool Cost Description Rochelle-Landers Pool Evansville, Indiana 20097,966$1,152,000$1,258,000 25 yard pool, zero depth entry, large participatory play feature, tot slide, medium sized slide, spray park features in zero depth entry City of Vincennes – Aquatic Facility Study
30
Cost Comparison of Other Facilities Year Built Pool S.F. Original Pool Cost 2012 Pool Cost Description Bethel Park Aquatic Center Indianapolis, Indiana 20116,691$1,146,000$1,180,000 25 yard pool, zero depth entry, large participatory play feature, “run-out” slide City of Vincennes – Aquatic Facility Study
31