2014 N.C. Water Resources Congress October 30 http://ncwrcongress.org/http://ncwrcongress.org/ NC State University McKimmon Center
2
Jonathan Williams, PE (NC, SC, TX) HDR Assistant Project Manager 9 years at HDR Structural engineering background o Water/wastewater facilities o Municipal infrastructure Water supply planning o Regional & municipal water planning o Water supply permitting and licensing o Water quantity modeling o Contingency/emergency planning o Feasibility studies o Preliminary infrastructure engineering Contact: jonathan.williams@hdrinc.comjonathan.williams@hdrinc.com
3
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Supply Master Plan
4
2006 Water Supply Study found maximum capacity of Catawba River Basin for water supply could be reached mid-century Catawba-Wateree Water Management Group incorporated - December 2007 Water Supply Master Plan commissioned in 2010 Purpose of Master Plan is to find ways to extend the time before the capacity of the Basin is reached Background
5
The Catawba-Wateree Water Management Group (CWWMG) 501(c)3 non-profit organization Formed in 2007 (Duke-Energy relicensing) 18 public water supply utility members 1 power utility member (Duke Energy) 4,750 square mile river basin (NC & SC) 11 reservoir system 2 million people dependent on this basin Foothills of NC to Sandhills of SC Mission: “ to identify, fund, and manage projects that will help preserve, extend, and enhance the capabilities of the Catawba-Wateree River Basin to provide water resources for human needs while maintaining the ecological integrity of the waterway. ”
6
CWWMG Members City of Belmont, NC City of Camden, SC Catawba River Water Treatment Plant (Union County, NC & Lancaster County Water and Sewer District, SC) Charlotte-Mecklenburg Utility Department, NC Chester Metropolitan District, SC Duke Energy Carolinas, NC & SC Two Rivers Utilities (Gastonia), NC Town of Granite Falls, NC City of Hickory, NC City of Lenoir, NC Lincoln County, NC Town of Long View, NC Lugoff-Elgin Water Authority, SC Town of Mooresville, NC City of Morganton, NC City of Mount Holly, NC City of Rock Hill, SC City of Statesville, NC Town of Valdese, NC http://www.catawbawatereewmg.org
7
Basin-Wide Water Supply Planning Future water use projections Water yield modeling Evaluate yield enhancement strategies Identify drought vulnerabilities Identify regionalization opportunities Identify impact of future regulations Recommend public outreach initiatives Recommend water quality modeling initiatives
8
Project was funded by: Duke Energy Foundation North Carolina Department of Environment and Natural Resources South Carolina Department of Natural Resources Catawba-Wateree Water Management Group Acknowledgements/Thanks
9
Supplemental funding Stakeholder input Water use projections Refinement of hydrologic model Climate change impacts Develop & evaluate options Action plan and schedule Publish report Implementation, on-going public input Periodic future updates Elements of the Master Plan
10
Advisory level input by key organizations with an interest in future planning efforts for the Basin Intended to ensure a broad level of input from a diverse group of interested stakeholders Stakeholder Advisory Team (SAT)
11
Million gallons per day consumed and percent of total 419.4mgd How Water will be Used (2065) Steam/Electric Power 178.3, 43% Industrial 7.7, 2% Public Water Supply 198.5, 47% Agriculture/Irrigation 34.9, 8%
12
Water Use Projections
13
Safe Yield Study o How to define and determine safe yield o Can safe yield be increased? Sedimentation Monitoring Study Water Use Efficiency Study Full reports can be found at www.catawbawatereewmg.org www.catawbawatereewmg.org Low Inflow Protocol review Pre-Master Plan Project Research
14
Sensitivity Analysis Evaluated variation in population growth Evaluated climate change impacts o No impacts o Baseline (moderate) impacts – focused on temperature rise o High impact – temperature rise and reduced precipitation/inflow CWWMG – First in the region to incorporate climate change into water use planning Population and Climate Change
15
Playing the “What If?” Game with a Robust Water Model Baseline Population growth Climate change Public water supplier water use changes (water use efficiency, reroute wastewater) Power consumptive water use changes (e.g. relocation of demand) New off-stream storage reservoirs Critical intake modifications Effluent flow recycling Modified reservoir operations Low Inflow Protocol (drought management plan) modifications Individual and Integrated Future Planning Scenarios
16
Improve safe yield of the Basin by over 200 mgd Extend water yield by 40 years Results and Recommendations
17
Increase water use efficiency Lower critical water intakes/elevations o Power plant o Public water supply Raise target lake levels during summer months Enhance drought responsiveness through Low Inflow Protocol Key Recommendations
18
Example: average per capita use in the Charlotte-Mecklenburg system o Current ~100 gallons/day/person (residential) o Recommended 2065~80 gallons/day/person (residential) Water Use Efficiency Recommendations
19
Where’s the Water Going? CW Reservoir System Water Balance Wateree Hydro Station outflows 3,359 mgd (1,085 mgd) Natural surface evaporation 204 mgd (all eleven lakes combined) (204 mgd) Surface and groundwater inflow 3,752 mgd (1,491 mgd) Public Water Supply 92 mgd (98 mgd) Industrial 3 mgd (6 mgd) Thermal Power 74 mgd (78 mgd) Irrigation 20 mgd (20 mgd) Water withdrawals are average net amounts for 2006–2013 and total 189 mgd (202 mgd) Natural inflow, natural evaporation, and hydro outflow are annual average amounts from hydrology data set used in CHEOPS™ model * mgd = million gallons per day. To convert to cubic feet per second (cfs), multiply all numbers by 1.5475 Values in italics represent corresponding inflow, withdrawals, and outflow for the worst 12 months during the 2007-2009 drought (7/01/2007 to 6/30/2008)
20
So What is Duke Energy’s Role? Manage the Water Resource Manage the region’s raw water supply (big, ongoing investment) Implement Comprehensive Relicensing Agreement (CRA) and new license Continue making electric customers more energy-efficient. In 2009-2014, Duke Energy’s energy conservation programs across the Carolinas o Reduced capacity needs by total of ≈ 1,200 MW (about a nuclear unit) o Reduced energy needs by total of ≈ 2,442,000 MWh (about a billion gallons of water equivalent)
21
So What is Duke Energy’s Role? Be a Good Partner Remain a dues-paying, active member of the Catawba-Wateree Water Management Group Help provide leadership and coordination Implement the Water Supply Master Plan Pursue the identified initiatives o Water use for thermal plant replacements/additions o Quicker response in Low Inflow Protocol o Increase summer target elevations for selected reservoirs
22
Implementation of the Catawba-Wateree Water Supply Master Plan extends the River’s capacity to sustain growth through 2100 Projected Results
23
Complete Water Supply Master Plan Report is available at www.catawbawatereewmg.org Questions?