Download presentation
Presentation is loading. Please wait.
Published byBernadette Bruce Modified over 9 years ago
1
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Temperature Uncertainty Budget and Calibration Fred Best 9 March 2004
2
9 March 2004 Slide 2 Temperature Error Budget
3
9 March 2004 Slide 3 Blackbody Section – Side View Enclosure Tube (Aluminum) Front Cover (Alum) Multi-layer Insulation (not shown) Cavity Support/ Insulator (Noryl) Electrical Connector Mounting Base (Noryl) Circumferental Heater Thermistors 4 Temperature Measurement 2 Redundant Temp Control 1 Overtemp Blackbody Cavity (Aluminum) Chemglaze Z306 Paint
4
9 March 2004 Slide 4 Blackbody Temperature Calibration Configuration
5
9 March 2004 Slide 5 GIFTS BB Calibration Scheme
6
9 March 2004 Slide 6 Blackbody Temperature Calibration The Blackbody and Controller will undergo end- to-end calibration. The temperature of the Blackbody and Controller can be independently controlled. Ambient Blackbody calibrated over the range from: -40 C to 0 C. Hot Blackbody calibrated over the range from: 0 C to +40 C. For calibration the Controller will be maintained at near 0 C. {The system will be calibrated at other Controller temperatures if a temperature dependence is discovered during EM-2 testing.
7
9 March 2004 Slide 7 Temperature Calibration Standard Absolute Temperature Calibration of end- to-end System at Hart has Uncertainty Of +/- 0.003 K (k=2) Thermometrics SP-60 Probes (2) Hart 2563 Standard Thermistor Module Hart 2564 Thermistor Scanner Module Hart 3560 Extended Communications Module Calibration Computer
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.