Download presentation
Presentation is loading. Please wait.
Published bySheryl Martha French Modified over 9 years ago
1
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair
2
Introduction Our Focus: – Prototype both a quarterback and a receiver in order to complete an offensive passing play. Today’s Discussion: – Prototype construction – Programming – Documentation
3
Previous Week’s Action Items Item 1: Construct Robot Bodies – Machined all HDPE pieces. – Assembled all basic structural body components. – QB: integration of throwing arm near completion. – Receiver: integration of the interrupt piece still in question.
4
Previous Week’s Action Items Item 2: Complete Working Programs for Each Component – Quarterback: All components OPERATIONAL (arm and base). – Receiver: Speed controlled drive wheels OPERATIONAL. Infrared interrupter OPERATIONAL. Front drive wheels are NOT PROGRAMMED.
5
Current Status of Concept Status of the Design – Prototype Construction – Back on schedule: Moving forward at a good pace. – Minor show-stopper: Attachment of interrupt dial to receiver wheel.
6
Quarterback Current Graphic
7
Receiver Current Graphic
8
Next Week’s Action Items Item 1: Complete Design Documentation – Complete and proofread each deliverable. – Upload to website. – Tie up loose ends on website. Item 2: Integrate Program Components – Combine components into one main program for the quarterback robot.
9
Conclusion Important Points: – All parts machined, basic construction complete. – Working programs for every element except the receiver turning wheels. – Design documentation and main programs for the quarterback will be complete next week.
10
Questions? Any questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.