Presentation is loading. Please wait.

Presentation is loading. Please wait.

MBT Alpha SFOSLIC SFOCIC Front Ends L1 (SCL) MBT Alpha SLIC Example: Test Stand Shadowing a SLIC Test Stand A.Maciel L2mu NIU Target Shadow MBT/Alpha outputs.

Similar presentations


Presentation on theme: "MBT Alpha SFOSLIC SFOCIC Front Ends L1 (SCL) MBT Alpha SLIC Example: Test Stand Shadowing a SLIC Test Stand A.Maciel L2mu NIU Target Shadow MBT/Alpha outputs."— Presentation transcript:

1 MBT Alpha SFOSLIC SFOCIC Front Ends L1 (SCL) MBT Alpha SLIC Example: Test Stand Shadowing a SLIC Test Stand A.Maciel L2mu NIU Target Shadow MBT/Alpha outputs not shown coaxialUTP undo (*) Need SFO at receiving end because SLICs are not transformer coupled, and therefore should not be plugged to long cables. You also want to send single channels only to test stand. SFO pigtail

2 SFO Usage as Central Scint. Fan Out to SLICs East Octant Scints come in three CIC single channels East side (050,0) East top (051,0) East bottom (056,0) SFOSFO L1 trigger data A-layer east BC- ” oct.0 BC- ” oct.7 BC- ” oct.1 BC- ” oct.6 (051,056) L1 trigger data (051,056) A-layer east Input CIC ChannelsDestination SLIC channels A.Maciel L2mu NIU West ibid. with (52,0) (53,0) (55,0) as inputs Needs two SFO’s, one East, one West. Each SFO needs two “pigtails” of type (male)**3 - permanent – plus 2* 30cm cables (male)**2 20 cm To SLIC Length = 12.5m

3 SFO Usage as Central Scint. Fan Out to Shadow SLICs East side (050,0) East top (051,0) East bottom (056,0) SFOSFO L1 trigger data A-layer east BC- ” oct.0 BC- ” oct.7 BC- ” oct.1 BC- ” oct.6 (051,056) L1 trigger data to target SLIC (051,056) A-layer east Input CIC ChannelsDestination SLIC channels A.Maciel L2mu NIU 20 cm To SLIC Length = 12.5m all male connectors SFOSFO To shadow SLIC (L1) at Test Stand To shadow SLIC (L1) at Test Stand To shadow SLIC (L1) at Test Stand To target (L1) SLIC obs: Scint. data from CIC comes in single channel Both SFO’s are on CIC crate

4 SFO Usage for Shadowing any one SLIC CIC Generic Input; 6 double channels from CIC crate SFO Two SFOs at CIC crate 3 times SFO Two SFOs at Test Stand SLIC Image SLIC at Test Stand 3 times SFO SLIC 3 times Target SLIC at Muon Crate A.Maciel L2mu NIU 20 cm To SLIC Length = 20cm female ! 20 cm from CIC Length = 1m all male 6 6 20 cm To SLIC Length = 1m all male 6 14x30m

5 20 cm Central Scint Fanout set permanently from CIC crate to Muon Crate total = 4 Pigtail Totals Summary SFO SLIC Shadowing from CIC crate to Muon Crate. Female connector on twochan end total = 6 SLIC Shadowing T.Stand to T.Stand Length = 1m total = 6 SLIC Shadowing Within Muon crates Length = 1m total = 6 All (male) A.Maciel L2mu NIU 12.5m 20 cm SFO All (male) 1m 20 cm SFO (female) 20cm SFO to SLIC CIC to SFO

6 cable length(*)connectors non-muon3350m520 male muon2850m 500 male 10 female total6200m 1120 male(*) 20 female (*) includes 10% added Level-2 Hotlink Totals

7 Shadowing a Generic SLIC A.Maciel L2mu NIU Generic SLIC has 8 double channel inputs; (SCL,idle) (ch.2, ch.3) (ch.14,ch.15) one single seven doubles Step 1; convert double inputs to 14 singles. 7(1  2) pigtails Step 2; make 14 data copies 6x(1  2) = 1 st dedicated SFO 6x(1  2) = 2 nd dedicated SFO 2x(1  2) = borrowed SFO Step 3; connect 14 channels PP MCH2  PP FCH2 PP has chs.215 specified Step 4; convert 14 single inputs to 7 doubles [7(2  1) pigtails] acc. to specific SLIC under study, re-connect target SLIC Step 5; repeat step 4 at Test Stand, connect shadow SLIC. 7(1  2) pigtails Step 6;

8 UTP Cable Terminations A.Maciel L2mu NIU Idle pairs grounded and capacitor terminated (rec.) to eliminate DCs from ground offsets Active (signal) pair is transformer coupled on both input and output


Download ppt "MBT Alpha SFOSLIC SFOCIC Front Ends L1 (SCL) MBT Alpha SLIC Example: Test Stand Shadowing a SLIC Test Stand A.Maciel L2mu NIU Target Shadow MBT/Alpha outputs."

Similar presentations


Ads by Google