Presentation is loading. Please wait.

Presentation is loading. Please wait.

BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013.

Similar presentations


Presentation on theme: "BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013."— Presentation transcript:

1 BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013

2 Meeting Agenda Intro: San Francisco and BART State of Good Repair Cars (Fleet Upgrades) San Francisco BART Stations BART Metro Update Priorities

3 2/3rds of BART trips start or end on Market Street 3

4 BART’s Market Area in Downtown SF 4

5 BART Share of SF Transit Trips 5 1)MTC Transit Statistical Summary, June 2012 2)BART Operating Budgets, 2012 3)Transit Center District Plan, DEIR Transportation Impact Study, Technical Appendix,Vol. 1, San Francisco Planning Department

6 BART’s SOGR Status Held our own up to now  Customer expectations high  System resiliency/redundancy low 40-year old plant is decaying We operate at the limits of capacity to meet growing demand Increased service demand is consuming the assets Reduces asset useful life and pushes forward needed capital rehabilitation projects 6 San Francisco Bay Area Rapid Transit District

7 BART ASSETS (~$20B) 7 BART owns 40,000 assets San Francisco Bay Area Rapid Transit District

8 “CONDITION” of ASSETS (at current level of investment) TODAY +10 YEARS (2022) $6B Poor $12.4B Poor The state of the asset, including its stage in life cycle 8 San Francisco Bay Area Rapid Transit District

9 BART’s SOGR Need $6B need for 10 year high priority projects $17B need for next 30 years 539 capital projects identified At 40, BART is facing its FIRST comprehensive rehabilitation cycle 9 San Francisco Bay Area Rapid Transit District

10 New York MTA in the 1970s 10 It took three decades to recover.

11 BART: The Next 40 Years BART Capacity Needs Peak Direction Trains are getting too crowded Peak Morning Platform Escalator Queues at Embarcadero & Montgomery stations are getting too long Peak Afternoon Platforms are also getting too crowded Growth Scenarios: At 500,000 riders, thresholds exceeded during delays At 750,000 riders, thresholds exceeded during on-time service 11

12 Weekday BART Ridership since SF Airport Extension Opening Record Ridership: Avg. 6% growth over 2 years 12

13 BART: The Next 40 Years Projected Weekday Ridership 13

14 Peak Transbay Vehicle Load Standard: 107 Passengers per Car 60 Seated plus 47 Standees 6.4 Square Feet per Standee 14Operations Planning

15 Standee Area Grows as Crowding Grows Morning Standee Limits Noted In Purple 107 130 15Operations Planning Travel time to Embarcadero (in minutes) 40’ 30’ 28’ 43’ 32’ 36’ 32’ 24’

16 The Trade-Off Between Capacity and Service Quality DateRidership Peak Hr_Direction PAX per Car Train On Time Performance Pax On Time Performance Nov. 2012393,32810794.8%96.7% 11/03/2010*522,19812051.3%71.7% 10/31/2012*568,06114069.9%79.2% Operations Planning16 * 2010 and 2012 SF Giants World Series Parade Day

17 Peak Hour Vehicle Load Levels with 775 Cars Plan Year SRTP Ridership Growth ~1.8% yr Core Ridership Growth = 3% yr 2020115 avg (132 max)130 avg (149 max) 2030134 (154)177 (202) Operations Planning17 Compared to current standard of 107 avg (122 max)

18 Fleet Sizes Needed to Achieve Vehicle Load Target of 107 Per Car Plan Year SRTP Ridership Growth ~1.8% yr Core Ridership Growth = 3% yr 2020880 cars1,000 cars* 20301,020 cars*1,070 cars* Operations Planning18 * Assumes Train Control System Modernization Project @ 30 peak trains/ hour

19 Station Capacity is a Peak Period Issue at Embarcadero & Montgomery 19

20 BART: The Next 40 Years Interim Access & Capacity Measures Infrastructure Reduce platform furniture footprint: benches, pay phones High capacity elevators Higher performance escalators Platform screen doors Street Escalator Canopies System Management Metering Measures: real time platform headcount system Skip Stop Service: Montgomery has more capacity than Embarcadero (New Years Eve Plan) In Station Crowd Management (Giants Parade Day) Transbay bus to Transbay Terminal 20

21 BART: The Next 40 Years The Ultimate Solution: New Side Platforms 21 Total Estimated Construction Cost: $615 million (2009 dollars) Mission Critical Improvement as ridership starts to exceed 500,000 per weekday

22 BART Metro Service Plan: 30 Peak Hour Transbay Trains Operations Planning22

23 BART Metro Service Plan: Enhanced Evening/Weekend Service

24 Proposed Priorities for SF Funding San Francisco Stations State of Good Repair San Francisco Station Access Improvements San Francisco Stations Capacity Expansion


Download ppt "BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013."

Similar presentations


Ads by Google