Presentation is loading. Please wait.

Presentation is loading. Please wait.

Anthony Borton. MV P “It was an epic failure... I tried to get on and couldn't” I'm really annoyed that I wasted so much time trying to get onto.

Similar presentations


Presentation on theme: "Anthony Borton. MV P “It was an epic failure... I tried to get on and couldn't” I'm really annoyed that I wasted so much time trying to get onto."— Presentation transcript:

1 Anthony Borton

2 MV P

3

4

5 “It was an epic failure... I tried to get on and couldn't” I'm really annoyed that I wasted so much time trying to get onto their site last night."

6 Capacity/Scale Testing Designed to determine the ability of your application to scale. Covers both scale up and scale out scenarios. Not just be increasing user load but may include things like geographic distribution. Stress Testing Essentially Load Testing done under extreme (non typical) load. Try to break the system under test by overwhelming or removing its resources. Designed to ensure the system fails and recovers gracefully. Testing done in “real world” scale without focusing on breaking the system. Designed to ensure the system meets performance baselines and expose bugs not found during cursory testing such as memory leaks, buffer overflows, etc. Designed to eliminate bottlenecks and establish a baseline for future regression testing. Validates responsiveness, reliability and scalability

7

8

9 Professional Ultimate  Code Metrics  Code Coverage  Coded UI Testing  Code Clone  Code Review  Task Suspend/Resume  Microsoft Fakes  Test Case Management  Manual Testing and Fast-Forward  Exploratory Testing  Lab Management  PowerPoint Storyboarding  Backlog Management  Sprint Planning  Feedback Manager Mission-critical scale and complexity Development productivity everywhere  Windows Desktop and Phone Apps  Windows 8 Metro Style Apps  Web and Cloud Websites and Services  Office and SharePoint Development  Blend for Visual Studio  LightSwitch  Extensible Testing Framework  Static Code Analysis  Advanced Profiling  Refactoring  Graphics Debugging  Third-Party Extensibility  Read-Only Diagrams  Team Explorer

10

11

12

13

14

15

16

17 http://msdn.microsoft.com/en-au/ http://www.microsoftvirtualacademy.com/ http://channel9.msdn.com/Events/TechEd/Australia/2013 http://technet.microsoft.com/en-au/

18


Download ppt "Anthony Borton. MV P “It was an epic failure... I tried to get on and couldn't” I'm really annoyed that I wasted so much time trying to get onto."

Similar presentations


Ads by Google