BIM Overview Stacy Scopano
2
AEC is a fragmented industry
3
Traditional Process DOC
4
Conceptual Phase Schematic Phase Design Development Construction Documents Construction Phase Fabrication
5
As-Required Requirements As-Designed Design As-Planned Implementation plan As-Built Implementation in construction. As-Maintained Facility Management Greatest Industry Challenges: Data Recreation Error due to Human Interpretation
6
As-Required Requirements As-Designed Design As-Planned Implementation plan As-Built Implementation in construction. As-Maintained FM Greatest Industry Challenges: Data Recreation Error due to Human Interpretation $15.8 billion in annual interoperability costs were quantified for the capital facilities industry in 2002. Of these costs, two-thirds are borne by owners and operators, which incur most of these costs during ongoing facility operation and maintenance (O&M). In addition to the costs quantified, respondents indicated that there are additional significant inefficiency and lost opportunity costs associated with interoperability problems that were beyond the scope of our analysis. Thus, the $15.8 billion cost estimate developed in this study is likely to be a conservative figure.
7
Key BIM Concepts
10
Phases of Adoption DOC BIM as “deliverable” BIM processLonely BIM Drawing based process BIM based process
11
2008 BIM Adoption Report
12
BIM Continuing Development
13
Challenges & Opportunities
14
BIM software Native data (Master) BIM software Native data (Master) BIM software Native data (Master) The ”Cloud” Future “Transactions”
15
Visual Transaction Example Coordinate mechanical & structural designs Penetration request –MEP designer creates request –Structural designer approves request and creates penetration –MEP engineer modifies design –Modifies the penetration request –Structural designer recognizes the change and adjusts
16
An innovative case New Meadowlands Stadium
17
Internet TabletPC with RFID Reader Manufactured 1 RFID Tag 2 Ready to ship RFID Tag Received on Site 3 RFID Tag Erected 4 RFID Tag VelaSystems Servers (Vela Hosting Facility) 3D Model Reports Factory Jobsite Visualizing the Supply Chain