Strategy for SPS 200 MHz LLRF upgrade (1) Each of the four cavities (2x 5 sections, 2x 4 sections): 1-T Feedback (loop around cavity and amplifier) Feedforward (taking beam signal from pick-up) Electronics to generate a cavity sum signal with special time of flight compensation for ions Instrumentation and hardware for monitoring and interlocking, cavity phase and gain monitoring For each cavity: cavity phase and amplitude loop rendering the cavity phase independent of the forward phase of the power system and controlling the cavity voltage Cavity Controller Part, i.e. per cavity Must be completed when restarting after LS2 as we will have six cavities with characteristics different from the present ones (4x 3 sections, 2x 4 sections) Need test of a new cavity controller in a test stand and / or the machine; testing prototype in 2017 gives margin to react before LS2 restart in 2020 Considerable infrastructure, cabling and commissioning work in tunnel with movements of cavities and pick-ups in LS2
2
Strategy for SPS 200 MHz LLRF upgrade (2) different beam types traditionally run with separate systems SPS fixed target beam (14 GeV 450 GeV) SPS LHC beam (26 Gev 450 GeV) SPS ions, Pb and Ar with FSK modulation of the RF Beam loops Frequency/synchro loop (acting on cavity frequency/phase) Radial loop (acting on cavity frequency/phases) Longitudinal damper (acting on two cavities max) Beam Control: Loops closing around beam New requirements for ions: separate control in frequency and phase for different cavities or cavity groups for slip-stacking Must define solution starting from requirements for ions, also impact on cavity controllers ! New digital frequency generation (with FSK) LHC VME-style for ions since <2010 New VME frequency program for protons/ions currently being deployed
3
Strategy for SPS 200 MHz LLRF upgrade (3) Options for splitting of cavities into groups a)2 groups: similar length cavities in same group b)2 groups strictly identical: 1x 4, 2x3 section, one power plant of each type c)3 groups: similar power plant in same group d)6 groups: each cavity with separate control maximum flexibility, but complex, locking/un-locking Wish from FB section to not have separate systems for the different beam types feasible, but how do we get there? Slip-stacking and beam control requirements: Miscellaneous (new) requirements Pulsed RF (to reduce CW) not before LS2 Bunch rotation for LHC beam …
4
Strategy for SPS 200 MHz LLRF upgrade (4) “Inventory” considered for consolidation (budget code 69318) Controls (obsolete MMI G64, MIL1553) completed in LS1 Electronics to distribute and receive synchronisation signals (generally via fiber) from and to the BA3 Faraday cage PS RF, LHC RF, BA2 damper, BA4 AWAKE, kickers, f rev done Consolidation of the instrumentation and hardware for diagnostics and MDs Beam Quality Monitor done Mountain Range Display done Pico scope done Oscilloscopes, network analyzers, spectrum analyzers Cavity phase monitoring done Peak detection ongoing OASIS monitoring for CCC upgrade with CO Hardware for new extractions: AWAKE, neutrino experiments financed by operation/other projects