Download presentation
Presentation is loading. Please wait.
1
Project 6 DS 413: Design Studio 413 May 9, 2012
7
1A: Avoid development of inappropriate sites 1B: Site within ¼ mile of 2 bus stops 1C: Water kept on site that falls there 1D: Roof materials supply high solar reflective index 1E: Rain garden
8
2A: Planting species native to the area 2B: Rainwater used for landscaping needs 2C: Water conserving toilet 2D: Low flow faucets 2E: High-efficiency fixtures
9
3A: Properly designed window layout to maximize sunlight 3B: Environmentally friendly HVAC system 3C: Shades to block out unwanted sunlight 3D: Utilize rain water 3E: Most windows are not placed on the west wall in order to keep the morning sun out
10
4A: Bamboo flooring 4B: 20% total value of materials originate regionally 4C: Recycling 4D: Materials made with recycled content 4E: 50% of all wood products are FSC certified
11
5A: Low emitting VOC paints used 5B: Carpet that is part of the Green Label Plus program 5C: Wood used without ureaformaldehyde resins 5D: Workers have access to daylight and views 5E: Monitoring system installed
12
6A: Solar electric computers 6B: 75% of roof surface has a solar reflective index of 78 6C: 50% reduction in potable water consumption - faucets 6D: 50% reduction in potable water consumption - shower 6E: 50% reduction in potable water consumption – high efficiency fixtures
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.