Airstrip (Total Disturbance 17.9 ha) and Borrow Pit (Total Disturbance 5.2 ha)
2
Airstrip Location Shazah Airstrip location (50 m wide by 950 m long raised at least 1 m above flood plain)
3
Area before airstrip was completed (2007) as a comparison
4
Shazah Airstrip under construction with material from Borrow Pit – Looking North (~50,000m3 fill extracted from borrow pit for airstrip) Borrow Pit Airstrip
5
Shazah Airstrip – Under Construction – Looking South. Note construction camp required for the construction of airstrip and further site development Shazah Airstrip under Construction Borrow Pit Construction Camp
6
heavy rip rap placed from quarried rock along road Heavy Rip Rap Placement
7
Heavy Rip Rap to protect airstrip against the annual flood Heavy Rip Rap Armour
8
Airport Fill – Raising the Airstrip Airport Fill against Rip Rap
9
Airport Fill from Burrow Pit
10
1 st Lift Complete Construction Camp 1 st Lift Complete
11
Airstrip upgrade
12
Completed airstrip
13
Construction Camp - Tulsequah