FINAL PROJECT CVE 4073 – Construction Cost Engr. Prof. Locurcio 12/04/2014
2
Group Members Aline Franqui Bianca Farias Gabriel Silva (PM) Gilberto Pierozan Julian Miyamoto Junior Badziak Lara Barroso
3
Outline Introduction Technical approach Tasks Responsabilities Bid Breakdown by major components Bid Summary
4
Introduction Since the past to our current age, mankind have always tried to let a legacy behind. In construction, we can make this wish last for ages. But nothing of it would have happened if there were no planning or management skills. In this project we could taste how the real world is, and how to be prepared to challenges to come.
5
Technical Approach We divided the work by lottery! As PM I assumed that since everyone have done all the homeworks, nobody would have problem. We’ve scheduled meetings twice a month So, as a group, we could see the progress of our work. After all the work was done, we revised the work from our collegues, to make sure it was correct
6
Task Responsabilities
7
Concrete
9
l Footing l Slab
11
l Footing
12
Footing
13
l Footing l Slab
14
Slab and Final Cost
15
#5 Rebars
16
Wood & Plastic
17
Dimensions of the elements used for Wood & Plastic and Thermal & Moisture
18
Studs
19
Headers
20
Blocking / OSB - CDX Total price for Wood & Plastic = $7,084.90
21
Thermal & Moisture
22
Total price for Thermal & Moisture = $1,570.34
23
Plumbing
25
VTR – vent tub riser LAV – lavatory WC – water closet TUB – tub shower CO – cleanout adapter KIT SK – kitchen sink
26
Plumbing 8’ 11.5’ 10.5’ 11.5’ 5’ 8’
27
Plumbing Hot water line: pass through tubs, lavatories and kitchen. Cold water line: pass through tubs, lavatories, water closets and kitchen. For tubs and wc: 1” pipe For lavatories and kitchen: ½” pipe
30
Roof
31
Roof main dimensions Calculate the area on the plane, and then use the following to have the inclined area: 34 54 4 (1+slope 2 ) 0.5
32
Roof Materials
33
Roof Calculation
34
HVAC
36
Electrical
45
Electrical Wiring and Fixtures Take-off
47
Openings
49
Finishes
50
Finishes Calculation
52
Bid Summary
53
Summary Sheet Description Material cost Equip. Cost Labor cost Total Cost Earthwork $3,737.52 $4,439.94 $3,826.49 $12,003.95 Concrete (Foundation) $6,017.25 $14.18 $2,260.39 $8,291.82 Wood, plastics and composites $2,716.42 $446.72 $2,595.58 $5,758.72 Openings $2,016.19 $- $546.00 $2,562.19 Plumbing and fixtures $299.05 $- $1,445.78 $1,744.82 Roof (with truss package on total cost) $5,020.98 $- $3,228.39 $11,249.37 HVAC System $4,159.46 $- $851.21 $5,010.67 Electrical $6,803.22 $- $8,392.86 $15,196.08 Fire Suppression $52.00 $- $29.00 $81.00 Thermal, moistures protection $757.61 $- $812.73 $1,570.34 Finishes $11,408.05 $8,094.97 $19,503.03 Specialties $2,500.00 Documentation $2,000.00 Labor Taxes (25%) $8,020.85 Sales Taxes (6%) $2,729.26 Subtotal $98,222.11 O&P (10%) $9,822.21 TOTAL COST $108,044.32
54
Questions?