MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields MICE PID detectors & Shielding MICE CM17, CERN Feb 25, 2007 V. Palladino, Univ & INFN Napoli for the small PID team Bonesini, Chimenti, Cremaldi, Giannini, Graulich, Gregoire, Karazdov, Orestano, Sandstrom, Summers, Torun, Tortora, Tsenov, and more
2
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields picture & contributors Upstream PID Review requirements (almost) fulfilled (AB dixit) TOF0-I being rescued from INFN funding crisis (with CalSys, KL and TOF II) Building & making installation plans (Aug-Sep 07) CKOV (LC) TOF0/I and Cal Sys (MB, YK) Completing design of TOF I global PMT shield cage (GG) ….. to be funded ! quite effective, mitigating local PMT shielding requirements Downstream A) EMCal/KL can be completed, if funding really OK, for installation with TOF0 & I in Aug-Sep 07 (DO for LT) a (simple) review procedure should/could endorse that B) TOF II : funding being solved, for installation Mar 2008 being driven to final design from PID (MB) & Analysis (RS/MA) teams as is global PMT shield cage (GG) (RS/MA) local PMT shielding issues, more severe, being finalized measurements in mag field in progress in Milano (MB) For all above, front end (RT) and read out (JSG) electronics well defined performance requirement being properly formulated (CR) complete G4MICE performance re-evaluation being taken up seriously (YK) Then C) EMCal/SW further away, in 2008, funding not tackled yet conceptual G4MICE design well advanced, proven to be necessary AND sufficient (RS) practical design started (GG, PC, AB)
3
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields to Alan for preview while few last answers still being added, MICE Note soon
4
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields to AB for preview Lucien
5
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields TOF0 & I, Maurizio OK
6
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields OK, if funds confirmed to be available
7
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields OK, if funds there
8
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields TOF I global shield (Ghislain) …………… NB to be funded and farmed !! After tech drawings finalized by Ghislain in consultation with Steve
9
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields Cage shield vs Plate shield (Maurizio) GG cage GG plate Choice soon + more local iron
10
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields Frascati test beam, YK So “TOFI-TOF0” < 70 ps
11
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields For real “TOFI-TOF0”, useful statistics only with (worse) active splitter useful to establish that time walk correction is needed (FADC)
12
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields KL … 3/7 exist …. can be finished for phase I, if funds NB … L. managed to make them larger than anticipated Domizia (and Ludovico)
13
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields
14
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields
15
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields
16
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields TOF II, Maurizio …. aiming at Mar 08 fixed
17
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields funds required, to be confirmed to be available
18
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields TOF II global shield, Ghislain 600 now 700 now being redone to be funded and farmed !! after tech drawings finalized by Ghislain in consultation with Steve
19
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields More local PMT shield needed Final word from Milano’s mag test stand
20
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields Radii of downstream holes and aperture (Rikard)
21
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields Radii of downstream holes and aperture (Marco) to be all checked through to be reduced AMAP!
22
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields
23
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields Downstream apertures yesterday’s decisions Front plate of TOF II shield 600 mm Lateral size of TOF II 600 mm Back plate of TOF II shield 700 mm Lateral size of KL 900 mm Lateral size of SW ≥ 1000 mm }
24
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields front end (Roumen) and read out (J. Sebastien) electronics well defined have (or can have) it all available for TOF0, I, KL of splitter & stretcher for FADC digitization of all detectors PID electronics OK
25
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields ps 70 ps OK for longitudinal emittance, Chris
26
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields Rikard :KL + SW do the e/µ separation with 99.9 efficiency 99,8 purity See MICE Note 164
27
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields SW detailed design being tackled (Pietro, Gianrossano, Alan) TO BE FUNDED ! On the floor in 2008?
28
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields Mechanics in Trieste Scibars from Fermilab prototype plane possibly soon
29
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields picture & contributors Upstream PID Review requirements (almost) fulfilled (AB dixit) TOF0-I being rescued from INFN funding crisis (with CalSys, KL and TOF II) Building & making installation plans (Aug-Sep 07) CKOV (LC) TOF0/I and Cal Sys (MB, YK) Completing design of TOF I global PMT shield cage (GG) ….. to be funded ! quite effective, mitigating local PMT shielding requirements Downstream A) EMCal/KL can be completed, if funding really OK, for installation with TOF0 & I in Aug-Sep 07 (DO for LT) a (simple) review procedure should/could endorse that B) TOF II : funding being solved, for installation Mar 2008 being driven to final design from PID (MB) & Analysis (RS/MA) teams as is global PMT shield cage (GG) (RS/MA) local PMT shielding issues, more severe, being finalized measurements in mag field in progress in Milano (MB) For all above, front end (RT) and read out (JSG) electronics well defined performance requirement being properly formulated (CR) complete G4MICE performance re-evaluation being taken up seriously (YK) Then C) EMCal/SW further away, in 2008, funding not tackled yet conceptual G4MICE design well advanced, proven to be necessary AND sufficient (RS) practical design started (GG, PC, AB)